A Critical Path Problem Using Triangular Neutrosophic Number Article Swipe
Florentín Smarandache
,
Mai Mohamed
,
Yongquan Zhou
,
Mohamed Abdel-Baset
·
YOU?
·
· 2017
· Open Access
·
YOU?
·
· 2017
· Open Access
·
The Critical Path Method (CPM) is one of several related techniques for planning and managing of complicated projects in real world applications. In many situations, the data obtained for decision makers are only approximate, which gives rise of neutrosophic critical path problem. In this paper, the proposed method has been made to find the critical path in network diagram, whose activity time uncertain. The vague parameters in the network are represented by triangular neutrosophic numbers, instead of crisp numbers. At the end of paper, two illustrative examples are provided to validate the proposed approach.
Related Topics
Metadata
- Type
- article
- Language
- en
- Landing Page
- https://digitalrepository.unm.edu/math_fsp/421
- https://digitalrepository.unm.edu/cgi/viewcontent.cgi?article=1387&context=math_fsp
- OA Status
- green
- Cited By
- 2
- Related Works
- 20
- OpenAlex ID
- https://openalex.org/W3092068443
All OpenAlex metadata
Raw OpenAlex JSON
- OpenAlex ID
-
https://openalex.org/W3092068443Canonical identifier for this work in OpenAlex
- Title
-
A Critical Path Problem Using Triangular Neutrosophic NumberWork title
- Type
-
articleOpenAlex work type
- Language
-
enPrimary language
- Publication year
-
2017Year of publication
- Publication date
-
2017-09-01Full publication date if available
- Authors
-
Florentín Smarandache, Mai Mohamed, Yongquan Zhou, Mohamed Abdel-BasetList of authors in order
- Landing page
-
https://digitalrepository.unm.edu/math_fsp/421Publisher landing page
- PDF URL
-
https://digitalrepository.unm.edu/cgi/viewcontent.cgi?article=1387&context=math_fspDirect link to full text PDF
- Open access
-
YesWhether a free full text is available
- OA status
-
greenOpen access status per OpenAlex
- OA URL
-
https://digitalrepository.unm.edu/cgi/viewcontent.cgi?article=1387&context=math_fspDirect OA link when available
- Concepts
-
Path (computing), Mathematics, Computer science, Programming languageTop concepts (fields/topics) attached by OpenAlex
- Cited by
-
2Total citation count in OpenAlex
- Citations by year (recent)
-
2024: 1, 2021: 1Per-year citation counts (last 5 years)
- Related works (count)
-
20Other works algorithmically related by OpenAlex
Full payload
| id | https://openalex.org/W3092068443 |
|---|---|
| doi | |
| ids.mag | 3092068443 |
| ids.openalex | https://openalex.org/W3092068443 |
| fwci | 0.0 |
| type | article |
| title | A Critical Path Problem Using Triangular Neutrosophic Number |
| biblio.issue | |
| biblio.volume | |
| biblio.last_page | |
| biblio.first_page | 403 |
| topics[0].id | https://openalex.org/T12709 |
| topics[0].field.id | https://openalex.org/fields/22 |
| topics[0].field.display_name | Engineering |
| topics[0].score | 0.9108999967575073 |
| topics[0].domain.id | https://openalex.org/domains/3 |
| topics[0].domain.display_name | Physical Sciences |
| topics[0].subfield.id | https://openalex.org/subfields/2207 |
| topics[0].subfield.display_name | Control and Systems Engineering |
| topics[0].display_name | Optimization and Mathematical Programming |
| is_xpac | False |
| apc_list | |
| apc_paid | |
| concepts[0].id | https://openalex.org/C2777735758 |
| concepts[0].level | 2 |
| concepts[0].score | 0.5910470485687256 |
| concepts[0].wikidata | https://www.wikidata.org/wiki/Q817765 |
| concepts[0].display_name | Path (computing) |
| concepts[1].id | https://openalex.org/C33923547 |
| concepts[1].level | 0 |
| concepts[1].score | 0.4261086583137512 |
| concepts[1].wikidata | https://www.wikidata.org/wiki/Q395 |
| concepts[1].display_name | Mathematics |
| concepts[2].id | https://openalex.org/C41008148 |
| concepts[2].level | 0 |
| concepts[2].score | 0.3713850975036621 |
| concepts[2].wikidata | https://www.wikidata.org/wiki/Q21198 |
| concepts[2].display_name | Computer science |
| concepts[3].id | https://openalex.org/C199360897 |
| concepts[3].level | 1 |
| concepts[3].score | 0.0 |
| concepts[3].wikidata | https://www.wikidata.org/wiki/Q9143 |
| concepts[3].display_name | Programming language |
| keywords[0].id | https://openalex.org/keywords/path |
| keywords[0].score | 0.5910470485687256 |
| keywords[0].display_name | Path (computing) |
| keywords[1].id | https://openalex.org/keywords/mathematics |
| keywords[1].score | 0.4261086583137512 |
| keywords[1].display_name | Mathematics |
| keywords[2].id | https://openalex.org/keywords/computer-science |
| keywords[2].score | 0.3713850975036621 |
| keywords[2].display_name | Computer science |
| language | en |
| locations[0].id | pmh:oai:digitalrepository.unm.edu:math_fsp-1387 |
| locations[0].is_oa | True |
| locations[0].source.id | https://openalex.org/S4377196368 |
| locations[0].source.issn | |
| locations[0].source.type | repository |
| locations[0].source.is_oa | False |
| locations[0].source.issn_l | |
| locations[0].source.is_core | False |
| locations[0].source.is_in_doaj | False |
| locations[0].source.display_name | UNM’s Digital Repository (University of New Mexico) |
| locations[0].source.host_organization | https://openalex.org/I169521973 |
| locations[0].source.host_organization_name | University of New Mexico |
| locations[0].source.host_organization_lineage | https://openalex.org/I169521973 |
| locations[0].license | cc-by |
| locations[0].pdf_url | https://digitalrepository.unm.edu/cgi/viewcontent.cgi?article=1387&context=math_fsp |
| locations[0].version | submittedVersion |
| locations[0].raw_type | text |
| locations[0].license_id | https://openalex.org/licenses/cc-by |
| locations[0].is_accepted | False |
| locations[0].is_published | False |
| locations[0].raw_source_name | Branch Mathematics and Statistics Faculty and Staff Publications |
| locations[0].landing_page_url | https://digitalrepository.unm.edu/math_fsp/421 |
| locations[1].id | mag:3092068443 |
| locations[1].is_oa | False |
| locations[1].source | |
| locations[1].license | |
| locations[1].pdf_url | |
| locations[1].version | |
| locations[1].raw_type | |
| locations[1].license_id | |
| locations[1].is_accepted | False |
| locations[1].is_published | |
| locations[1].raw_source_name | |
| locations[1].landing_page_url | https://vixra.org/pdf/1709.0205v1.pdf |
| authorships[0].author.id | https://openalex.org/A5012703845 |
| authorships[0].author.orcid | https://orcid.org/0000-0002-5560-5926 |
| authorships[0].author.display_name | Florentín Smarandache |
| authorships[0].author_position | first |
| authorships[0].raw_author_name | Florentin Smarandache |
| authorships[0].is_corresponding | False |
| authorships[1].author.id | https://openalex.org/A5019114754 |
| authorships[1].author.orcid | https://orcid.org/0009-0000-4488-8089 |
| authorships[1].author.display_name | Mai Mohamed |
| authorships[1].author_position | middle |
| authorships[1].raw_author_name | Mai Mohamed |
| authorships[1].is_corresponding | False |
| authorships[2].author.id | https://openalex.org/A5031740523 |
| authorships[2].author.orcid | https://orcid.org/0000-0003-4404-952X |
| authorships[2].author.display_name | Yongquan Zhou |
| authorships[2].author_position | middle |
| authorships[2].raw_author_name | Yongquan Zhou |
| authorships[2].is_corresponding | False |
| authorships[3].author.id | https://openalex.org/A5109414592 |
| authorships[3].author.orcid | |
| authorships[3].author.display_name | Mohamed Abdel-Baset |
| authorships[3].author_position | last |
| authorships[3].raw_author_name | Mohamed Abdel-Baset |
| authorships[3].is_corresponding | False |
| has_content.pdf | True |
| has_content.grobid_xml | True |
| is_paratext | False |
| open_access.is_oa | True |
| open_access.oa_url | https://digitalrepository.unm.edu/cgi/viewcontent.cgi?article=1387&context=math_fsp |
| open_access.oa_status | green |
| open_access.any_repository_has_fulltext | False |
| created_date | 2025-10-10T00:00:00 |
| display_name | A Critical Path Problem Using Triangular Neutrosophic Number |
| has_fulltext | False |
| is_retracted | False |
| updated_date | 2025-11-06T04:12:42.849631 |
| primary_topic.id | https://openalex.org/T12709 |
| primary_topic.field.id | https://openalex.org/fields/22 |
| primary_topic.field.display_name | Engineering |
| primary_topic.score | 0.9108999967575073 |
| primary_topic.domain.id | https://openalex.org/domains/3 |
| primary_topic.domain.display_name | Physical Sciences |
| primary_topic.subfield.id | https://openalex.org/subfields/2207 |
| primary_topic.subfield.display_name | Control and Systems Engineering |
| primary_topic.display_name | Optimization and Mathematical Programming |
| related_works | https://openalex.org/W2144195828, https://openalex.org/W951065567, https://openalex.org/W3101194496, https://openalex.org/W3014210069, https://openalex.org/W2964177077, https://openalex.org/W2183678500, https://openalex.org/W1673574776, https://openalex.org/W2769800144, https://openalex.org/W2949614666, https://openalex.org/W2952137743, https://openalex.org/W3096725340, https://openalex.org/W2146769229, https://openalex.org/W2952124096, https://openalex.org/W1944263682, https://openalex.org/W2789759202, https://openalex.org/W2989428254, https://openalex.org/W2800764130, https://openalex.org/W2138326442, https://openalex.org/W2185904080, https://openalex.org/W2736991226 |
| cited_by_count | 2 |
| counts_by_year[0].year | 2024 |
| counts_by_year[0].cited_by_count | 1 |
| counts_by_year[1].year | 2021 |
| counts_by_year[1].cited_by_count | 1 |
| locations_count | 2 |
| best_oa_location.id | pmh:oai:digitalrepository.unm.edu:math_fsp-1387 |
| best_oa_location.is_oa | True |
| best_oa_location.source.id | https://openalex.org/S4377196368 |
| best_oa_location.source.issn | |
| best_oa_location.source.type | repository |
| best_oa_location.source.is_oa | False |
| best_oa_location.source.issn_l | |
| best_oa_location.source.is_core | False |
| best_oa_location.source.is_in_doaj | False |
| best_oa_location.source.display_name | UNM’s Digital Repository (University of New Mexico) |
| best_oa_location.source.host_organization | https://openalex.org/I169521973 |
| best_oa_location.source.host_organization_name | University of New Mexico |
| best_oa_location.source.host_organization_lineage | https://openalex.org/I169521973 |
| best_oa_location.license | cc-by |
| best_oa_location.pdf_url | https://digitalrepository.unm.edu/cgi/viewcontent.cgi?article=1387&context=math_fsp |
| best_oa_location.version | submittedVersion |
| best_oa_location.raw_type | text |
| best_oa_location.license_id | https://openalex.org/licenses/cc-by |
| best_oa_location.is_accepted | False |
| best_oa_location.is_published | False |
| best_oa_location.raw_source_name | Branch Mathematics and Statistics Faculty and Staff Publications |
| best_oa_location.landing_page_url | https://digitalrepository.unm.edu/math_fsp/421 |
| primary_location.id | pmh:oai:digitalrepository.unm.edu:math_fsp-1387 |
| primary_location.is_oa | True |
| primary_location.source.id | https://openalex.org/S4377196368 |
| primary_location.source.issn | |
| primary_location.source.type | repository |
| primary_location.source.is_oa | False |
| primary_location.source.issn_l | |
| primary_location.source.is_core | False |
| primary_location.source.is_in_doaj | False |
| primary_location.source.display_name | UNM’s Digital Repository (University of New Mexico) |
| primary_location.source.host_organization | https://openalex.org/I169521973 |
| primary_location.source.host_organization_name | University of New Mexico |
| primary_location.source.host_organization_lineage | https://openalex.org/I169521973 |
| primary_location.license | cc-by |
| primary_location.pdf_url | https://digitalrepository.unm.edu/cgi/viewcontent.cgi?article=1387&context=math_fsp |
| primary_location.version | submittedVersion |
| primary_location.raw_type | text |
| primary_location.license_id | https://openalex.org/licenses/cc-by |
| primary_location.is_accepted | False |
| primary_location.is_published | False |
| primary_location.raw_source_name | Branch Mathematics and Statistics Faculty and Staff Publications |
| primary_location.landing_page_url | https://digitalrepository.unm.edu/math_fsp/421 |
| publication_date | 2017-09-01 |
| publication_year | 2017 |
| referenced_works_count | 0 |
| abstract_inverted_index.At | 79 |
| abstract_inverted_index.In | 22, 42 |
| abstract_inverted_index.by | 71 |
| abstract_inverted_index.in | 18, 56, 66 |
| abstract_inverted_index.is | 5 |
| abstract_inverted_index.of | 7, 15, 37, 76, 82 |
| abstract_inverted_index.to | 51, 89 |
| abstract_inverted_index.The | 0, 63 |
| abstract_inverted_index.and | 13 |
| abstract_inverted_index.are | 31, 69, 87 |
| abstract_inverted_index.end | 81 |
| abstract_inverted_index.for | 11, 28 |
| abstract_inverted_index.has | 48 |
| abstract_inverted_index.one | 6 |
| abstract_inverted_index.the | 25, 45, 53, 67, 80, 91 |
| abstract_inverted_index.two | 84 |
| abstract_inverted_index.Path | 2 |
| abstract_inverted_index.been | 49 |
| abstract_inverted_index.data | 26 |
| abstract_inverted_index.find | 52 |
| abstract_inverted_index.made | 50 |
| abstract_inverted_index.many | 23 |
| abstract_inverted_index.only | 32 |
| abstract_inverted_index.path | 40, 55 |
| abstract_inverted_index.real | 19 |
| abstract_inverted_index.rise | 36 |
| abstract_inverted_index.this | 43 |
| abstract_inverted_index.time | 61 |
| abstract_inverted_index.(CPM) | 4 |
| abstract_inverted_index.crisp | 77 |
| abstract_inverted_index.gives | 35 |
| abstract_inverted_index.vague | 64 |
| abstract_inverted_index.which | 34 |
| abstract_inverted_index.whose | 59 |
| abstract_inverted_index.world | 20 |
| abstract_inverted_index.Method | 3 |
| abstract_inverted_index.makers | 30 |
| abstract_inverted_index.method | 47 |
| abstract_inverted_index.paper, | 44, 83 |
| abstract_inverted_index.instead | 75 |
| abstract_inverted_index.network | 57, 68 |
| abstract_inverted_index.related | 9 |
| abstract_inverted_index.several | 8 |
| abstract_inverted_index.Critical | 1 |
| abstract_inverted_index.activity | 60 |
| abstract_inverted_index.critical | 39, 54 |
| abstract_inverted_index.decision | 29 |
| abstract_inverted_index.diagram, | 58 |
| abstract_inverted_index.examples | 86 |
| abstract_inverted_index.managing | 14 |
| abstract_inverted_index.numbers, | 74 |
| abstract_inverted_index.numbers. | 78 |
| abstract_inverted_index.obtained | 27 |
| abstract_inverted_index.planning | 12 |
| abstract_inverted_index.problem. | 41 |
| abstract_inverted_index.projects | 17 |
| abstract_inverted_index.proposed | 46, 92 |
| abstract_inverted_index.provided | 88 |
| abstract_inverted_index.validate | 90 |
| abstract_inverted_index.approach. | 93 |
| abstract_inverted_index.parameters | 65 |
| abstract_inverted_index.techniques | 10 |
| abstract_inverted_index.triangular | 72 |
| abstract_inverted_index.uncertain. | 62 |
| abstract_inverted_index.complicated | 16 |
| abstract_inverted_index.represented | 70 |
| abstract_inverted_index.situations, | 24 |
| abstract_inverted_index.approximate, | 33 |
| abstract_inverted_index.illustrative | 85 |
| abstract_inverted_index.neutrosophic | 38, 73 |
| abstract_inverted_index.applications. | 21 |
| cited_by_percentile_year.max | 94 |
| cited_by_percentile_year.min | 89 |
| countries_distinct_count | 0 |
| institutions_distinct_count | 4 |
| citation_normalized_percentile.value | 0.33065212 |
| citation_normalized_percentile.is_in_top_1_percent | False |
| citation_normalized_percentile.is_in_top_10_percent | False |