Exploring foci of:
doi.org
Accelerator Operations
January 2020 • M. Lamont, J. Wenninger, Ralph Steinhagen, Rogelio Tomás, R. Garoby, R. Aßmann, O. Brüning, M. Hostettler, H. Damerau
Abstract The cost of building a particle accelerator is a major capital investment. Commissioning should be swift and the subsequent exploitation of a facility must provide an effective return. This return may be difficult to quantify unambiguously but generally acceptable measures of performance can be established. These measures might include: machine availability; integrated luminosity; protons on target; beam hours to users and so on.
The Dancers At The End Of Time
Hope Ii
The Ninth Wave
The Bureaucrats (1936 Film)
Main Page
The False Mirror
The Massacre At Chios
Weapons (2025 Film)
Squid Game Season 3
Technological Fix
Harvester Vase
Electronic Colonialism
Victoria Mboko
Lauren Sánchez
Collective Action Problem
Shefali Jariwala
Hackers: Heroes Of The Computer Revolution
Community Fridge
Compassion Fade
F1 (Film)
Takahiro Shiraishi
The Wealth Of Networks
The 1975
This Changes Everything (Book)
Silencing The Past
Direct Action: An Ethnography
Sweet Porridge