Analysis of Implementation Time Performance Using Earned Value Method Article Swipe
YOU?
·
· 2025
· Open Access
·
· DOI: https://doi.org/10.37899/journallamultiapp.v6i5.2456
Construction projects often face cost and time constraints, while projects are required to be completed on schedule. To overcome these problems, an accurate management system is needed in a construction project to measure time performance, which refers to the progress of the work. By applying the earned value management (EVM) method, it is possible to project progress and weekly performance indices, making it easier to evaluate when there are deviations from the schedule. This study aims to analyze schedule variations and weekly time productivity, enabling the prediction of when the project will be completed. In the construction project of the Faculty of Law Building at Samratulangi University in North Sulawesi Province, reviews were conducted in weeks 1, 5, 10, 11, 20, and 25, where each review period had different CV, SV, and CPI values, allowing to assess at which time the predicted time was closest to the actual time occurring on-site.
Related Topics
- Type
- article
- Language
- en
- Landing Page
- https://doi.org/10.37899/journallamultiapp.v6i5.2456
- https://newinera.com/index.php/JournalLaMultiapp/article/download/2456/2113
- OA Status
- diamond
- OpenAlex ID
- https://openalex.org/W4414876227
Raw OpenAlex JSON
- OpenAlex ID
-
https://openalex.org/W4414876227Canonical identifier for this work in OpenAlex
- DOI
-
https://doi.org/10.37899/journallamultiapp.v6i5.2456Digital Object Identifier
- Title
-
Analysis of Implementation Time Performance Using Earned Value MethodWork title
- Type
-
articleOpenAlex work type
- Language
-
enPrimary language
- Publication year
-
2025Year of publication
- Publication date
-
2025-10-06Full publication date if available
- Authors
-
Darmawan Pontan, Daniel Daniel, Pentagon Pentagon, Manisha Pathania, Indrawati SumeruList of authors in order
- Landing page
-
https://doi.org/10.37899/journallamultiapp.v6i5.2456Publisher landing page
- PDF URL
-
https://newinera.com/index.php/JournalLaMultiapp/article/download/2456/2113Direct link to full text PDF
- Open access
-
YesWhether a free full text is available
- OA status
-
diamondOpen access status per OpenAlex
- OA URL
-
https://newinera.com/index.php/JournalLaMultiapp/article/download/2456/2113Direct OA link when available
- Cited by
-
0Total citation count in OpenAlex
Full payload
| id | https://openalex.org/W4414876227 |
|---|---|
| doi | https://doi.org/10.37899/journallamultiapp.v6i5.2456 |
| ids.doi | https://doi.org/10.37899/journallamultiapp.v6i5.2456 |
| ids.openalex | https://openalex.org/W4414876227 |
| fwci | 0.0 |
| type | article |
| title | Analysis of Implementation Time Performance Using Earned Value Method |
| biblio.issue | 5 |
| biblio.volume | 6 |
| biblio.last_page | 1346 |
| biblio.first_page | 1332 |
| topics[0].id | https://openalex.org/T13706 |
| topics[0].field.id | https://openalex.org/fields/14 |
| topics[0].field.display_name | Business, Management and Accounting |
| topics[0].score | 0.5266000032424927 |
| topics[0].domain.id | https://openalex.org/domains/2 |
| topics[0].domain.display_name | Social Sciences |
| topics[0].subfield.id | https://openalex.org/subfields/1408 |
| topics[0].subfield.display_name | Strategy and Management |
| topics[0].display_name | Management and Optimization Techniques |
| topics[1].id | https://openalex.org/T12945 |
| topics[1].field.id | https://openalex.org/fields/14 |
| topics[1].field.display_name | Business, Management and Accounting |
| topics[1].score | 0.48420000076293945 |
| topics[1].domain.id | https://openalex.org/domains/2 |
| topics[1].domain.display_name | Social Sciences |
| topics[1].subfield.id | https://openalex.org/subfields/1405 |
| topics[1].subfield.display_name | Management of Technology and Innovation |
| topics[1].display_name | Quality Function Deployment in Product Design |
| is_xpac | False |
| apc_list | |
| apc_paid | |
| language | en |
| locations[0].id | doi:10.37899/journallamultiapp.v6i5.2456 |
| locations[0].is_oa | True |
| locations[0].source.id | https://openalex.org/S4210230673 |
| locations[0].source.issn | 2716-3865, 2721-1290 |
| locations[0].source.type | journal |
| locations[0].source.is_oa | True |
| locations[0].source.issn_l | 2716-3865 |
| locations[0].source.is_core | False |
| locations[0].source.is_in_doaj | False |
| locations[0].source.display_name | Journal La Multiapp |
| locations[0].source.host_organization | |
| locations[0].source.host_organization_name | |
| locations[0].license | cc-by-sa |
| locations[0].pdf_url | https://newinera.com/index.php/JournalLaMultiapp/article/download/2456/2113 |
| locations[0].version | publishedVersion |
| locations[0].raw_type | journal-article |
| locations[0].license_id | https://openalex.org/licenses/cc-by-sa |
| locations[0].is_accepted | True |
| locations[0].is_published | True |
| locations[0].raw_source_name | Journal La Multiapp |
| locations[0].landing_page_url | https://doi.org/10.37899/journallamultiapp.v6i5.2456 |
| indexed_in | crossref |
| authorships[0].author.id | https://openalex.org/A5070521601 |
| authorships[0].author.orcid | https://orcid.org/0000-0001-7875-6105 |
| authorships[0].author.display_name | Darmawan Pontan |
| authorships[0].countries | ID |
| authorships[0].affiliations[0].institution_ids | https://openalex.org/I147337026 |
| authorships[0].affiliations[0].raw_affiliation_string | Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia |
| authorships[0].institutions[0].id | https://openalex.org/I147337026 |
| authorships[0].institutions[0].ror | https://ror.org/019fnr381 |
| authorships[0].institutions[0].type | education |
| authorships[0].institutions[0].lineage | https://openalex.org/I147337026 |
| authorships[0].institutions[0].country_code | ID |
| authorships[0].institutions[0].display_name | Universitas Trisakti |
| authorships[0].author_position | first |
| authorships[0].raw_author_name | Darmawan Pontan |
| authorships[0].is_corresponding | False |
| authorships[0].raw_affiliation_strings | Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia |
| authorships[1].author.id | https://openalex.org/A5113938812 |
| authorships[1].author.orcid | https://orcid.org/0009-0000-1213-3079 |
| authorships[1].author.display_name | Daniel Daniel |
| authorships[1].countries | ID |
| authorships[1].affiliations[0].institution_ids | https://openalex.org/I147337026 |
| authorships[1].affiliations[0].raw_affiliation_string | Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia |
| authorships[1].institutions[0].id | https://openalex.org/I147337026 |
| authorships[1].institutions[0].ror | https://ror.org/019fnr381 |
| authorships[1].institutions[0].type | education |
| authorships[1].institutions[0].lineage | https://openalex.org/I147337026 |
| authorships[1].institutions[0].country_code | ID |
| authorships[1].institutions[0].display_name | Universitas Trisakti |
| authorships[1].author_position | middle |
| authorships[1].raw_author_name | Daniel Daniel |
| authorships[1].is_corresponding | False |
| authorships[1].raw_affiliation_strings | Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia |
| authorships[2].author.id | https://openalex.org/A5119869798 |
| authorships[2].author.orcid | |
| authorships[2].author.display_name | Pentagon Pentagon |
| authorships[2].countries | ID |
| authorships[2].affiliations[0].institution_ids | https://openalex.org/I147337026 |
| authorships[2].affiliations[0].raw_affiliation_string | Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia |
| authorships[2].institutions[0].id | https://openalex.org/I147337026 |
| authorships[2].institutions[0].ror | https://ror.org/019fnr381 |
| authorships[2].institutions[0].type | education |
| authorships[2].institutions[0].lineage | https://openalex.org/I147337026 |
| authorships[2].institutions[0].country_code | ID |
| authorships[2].institutions[0].display_name | Universitas Trisakti |
| authorships[2].author_position | middle |
| authorships[2].raw_author_name | Pentagon Pentagon |
| authorships[2].is_corresponding | False |
| authorships[2].raw_affiliation_strings | Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia |
| authorships[3].author.id | https://openalex.org/A5100783987 |
| authorships[3].author.orcid | |
| authorships[3].author.display_name | Manisha Pathania |
| authorships[3].countries | ID |
| authorships[3].affiliations[0].institution_ids | https://openalex.org/I147337026 |
| authorships[3].affiliations[0].raw_affiliation_string | Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia |
| authorships[3].institutions[0].id | https://openalex.org/I147337026 |
| authorships[3].institutions[0].ror | https://ror.org/019fnr381 |
| authorships[3].institutions[0].type | education |
| authorships[3].institutions[0].lineage | https://openalex.org/I147337026 |
| authorships[3].institutions[0].country_code | ID |
| authorships[3].institutions[0].display_name | Universitas Trisakti |
| authorships[3].author_position | middle |
| authorships[3].raw_author_name | Manisha Manisha |
| authorships[3].is_corresponding | False |
| authorships[3].raw_affiliation_strings | Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia |
| authorships[4].author.id | https://openalex.org/A5086030229 |
| authorships[4].author.orcid | https://orcid.org/0000-0002-4275-7592 |
| authorships[4].author.display_name | Indrawati Sumeru |
| authorships[4].countries | ID |
| authorships[4].affiliations[0].institution_ids | https://openalex.org/I147337026 |
| authorships[4].affiliations[0].raw_affiliation_string | Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia |
| authorships[4].institutions[0].id | https://openalex.org/I147337026 |
| authorships[4].institutions[0].ror | https://ror.org/019fnr381 |
| authorships[4].institutions[0].type | education |
| authorships[4].institutions[0].lineage | https://openalex.org/I147337026 |
| authorships[4].institutions[0].country_code | ID |
| authorships[4].institutions[0].display_name | Universitas Trisakti |
| authorships[4].author_position | last |
| authorships[4].raw_author_name | Indrawati Sumeru |
| authorships[4].is_corresponding | False |
| authorships[4].raw_affiliation_strings | Civil Engineering, Trisakti University, Jl. Letjen S. Parman No. 1 West, Indonesia |
| has_content.pdf | True |
| has_content.grobid_xml | False |
| is_paratext | False |
| open_access.is_oa | True |
| open_access.oa_url | https://newinera.com/index.php/JournalLaMultiapp/article/download/2456/2113 |
| open_access.oa_status | diamond |
| open_access.any_repository_has_fulltext | False |
| created_date | 2025-10-10T00:00:00 |
| display_name | Analysis of Implementation Time Performance Using Earned Value Method |
| has_fulltext | False |
| is_retracted | False |
| updated_date | 2025-11-06T03:46:38.306776 |
| primary_topic.id | https://openalex.org/T13706 |
| primary_topic.field.id | https://openalex.org/fields/14 |
| primary_topic.field.display_name | Business, Management and Accounting |
| primary_topic.score | 0.5266000032424927 |
| primary_topic.domain.id | https://openalex.org/domains/2 |
| primary_topic.domain.display_name | Social Sciences |
| primary_topic.subfield.id | https://openalex.org/subfields/1408 |
| primary_topic.subfield.display_name | Strategy and Management |
| primary_topic.display_name | Management and Optimization Techniques |
| cited_by_count | 0 |
| locations_count | 1 |
| best_oa_location.id | doi:10.37899/journallamultiapp.v6i5.2456 |
| best_oa_location.is_oa | True |
| best_oa_location.source.id | https://openalex.org/S4210230673 |
| best_oa_location.source.issn | 2716-3865, 2721-1290 |
| best_oa_location.source.type | journal |
| best_oa_location.source.is_oa | True |
| best_oa_location.source.issn_l | 2716-3865 |
| best_oa_location.source.is_core | False |
| best_oa_location.source.is_in_doaj | False |
| best_oa_location.source.display_name | Journal La Multiapp |
| best_oa_location.source.host_organization | |
| best_oa_location.source.host_organization_name | |
| best_oa_location.license | cc-by-sa |
| best_oa_location.pdf_url | https://newinera.com/index.php/JournalLaMultiapp/article/download/2456/2113 |
| best_oa_location.version | publishedVersion |
| best_oa_location.raw_type | journal-article |
| best_oa_location.license_id | https://openalex.org/licenses/cc-by-sa |
| best_oa_location.is_accepted | True |
| best_oa_location.is_published | True |
| best_oa_location.raw_source_name | Journal La Multiapp |
| best_oa_location.landing_page_url | https://doi.org/10.37899/journallamultiapp.v6i5.2456 |
| primary_location.id | doi:10.37899/journallamultiapp.v6i5.2456 |
| primary_location.is_oa | True |
| primary_location.source.id | https://openalex.org/S4210230673 |
| primary_location.source.issn | 2716-3865, 2721-1290 |
| primary_location.source.type | journal |
| primary_location.source.is_oa | True |
| primary_location.source.issn_l | 2716-3865 |
| primary_location.source.is_core | False |
| primary_location.source.is_in_doaj | False |
| primary_location.source.display_name | Journal La Multiapp |
| primary_location.source.host_organization | |
| primary_location.source.host_organization_name | |
| primary_location.license | cc-by-sa |
| primary_location.pdf_url | https://newinera.com/index.php/JournalLaMultiapp/article/download/2456/2113 |
| primary_location.version | publishedVersion |
| primary_location.raw_type | journal-article |
| primary_location.license_id | https://openalex.org/licenses/cc-by-sa |
| primary_location.is_accepted | True |
| primary_location.is_published | True |
| primary_location.raw_source_name | Journal La Multiapp |
| primary_location.landing_page_url | https://doi.org/10.37899/journallamultiapp.v6i5.2456 |
| publication_date | 2025-10-06 |
| publication_year | 2025 |
| referenced_works_count | 0 |
| abstract_inverted_index.a | 28 |
| abstract_inverted_index.1, | 116 |
| abstract_inverted_index.5, | 117 |
| abstract_inverted_index.By | 43 |
| abstract_inverted_index.In | 94 |
| abstract_inverted_index.To | 17 |
| abstract_inverted_index.an | 21 |
| abstract_inverted_index.at | 104, 137 |
| abstract_inverted_index.be | 13, 92 |
| abstract_inverted_index.in | 27, 107, 114 |
| abstract_inverted_index.is | 25, 52 |
| abstract_inverted_index.it | 51, 62 |
| abstract_inverted_index.of | 40, 87, 98, 101 |
| abstract_inverted_index.on | 15 |
| abstract_inverted_index.to | 12, 31, 37, 54, 64, 76, 135, 145 |
| abstract_inverted_index.10, | 118 |
| abstract_inverted_index.11, | 119 |
| abstract_inverted_index.20, | 120 |
| abstract_inverted_index.25, | 122 |
| abstract_inverted_index.CPI | 132 |
| abstract_inverted_index.CV, | 129 |
| abstract_inverted_index.Law | 102 |
| abstract_inverted_index.SV, | 130 |
| abstract_inverted_index.and | 5, 57, 80, 121, 131 |
| abstract_inverted_index.are | 10, 68 |
| abstract_inverted_index.had | 127 |
| abstract_inverted_index.the | 38, 41, 45, 71, 85, 89, 95, 99, 140, 146 |
| abstract_inverted_index.was | 143 |
| abstract_inverted_index.This | 73 |
| abstract_inverted_index.aims | 75 |
| abstract_inverted_index.cost | 4 |
| abstract_inverted_index.each | 124 |
| abstract_inverted_index.face | 3 |
| abstract_inverted_index.from | 70 |
| abstract_inverted_index.time | 6, 33, 82, 139, 142, 148 |
| abstract_inverted_index.were | 112 |
| abstract_inverted_index.when | 66, 88 |
| abstract_inverted_index.will | 91 |
| abstract_inverted_index.(EVM) | 49 |
| abstract_inverted_index.North | 108 |
| abstract_inverted_index.often | 2 |
| abstract_inverted_index.study | 74 |
| abstract_inverted_index.there | 67 |
| abstract_inverted_index.these | 19 |
| abstract_inverted_index.value | 47 |
| abstract_inverted_index.weeks | 115 |
| abstract_inverted_index.where | 123 |
| abstract_inverted_index.which | 35, 138 |
| abstract_inverted_index.while | 8 |
| abstract_inverted_index.work. | 42 |
| abstract_inverted_index.actual | 147 |
| abstract_inverted_index.assess | 136 |
| abstract_inverted_index.earned | 46 |
| abstract_inverted_index.easier | 63 |
| abstract_inverted_index.making | 61 |
| abstract_inverted_index.needed | 26 |
| abstract_inverted_index.period | 126 |
| abstract_inverted_index.refers | 36 |
| abstract_inverted_index.review | 125 |
| abstract_inverted_index.system | 24 |
| abstract_inverted_index.weekly | 58, 81 |
| abstract_inverted_index.Faculty | 100 |
| abstract_inverted_index.analyze | 77 |
| abstract_inverted_index.closest | 144 |
| abstract_inverted_index.measure | 32 |
| abstract_inverted_index.method, | 50 |
| abstract_inverted_index.project | 30, 55, 90, 97 |
| abstract_inverted_index.reviews | 111 |
| abstract_inverted_index.values, | 133 |
| abstract_inverted_index.Building | 103 |
| abstract_inverted_index.Sulawesi | 109 |
| abstract_inverted_index.accurate | 22 |
| abstract_inverted_index.allowing | 134 |
| abstract_inverted_index.applying | 44 |
| abstract_inverted_index.enabling | 84 |
| abstract_inverted_index.evaluate | 65 |
| abstract_inverted_index.indices, | 60 |
| abstract_inverted_index.on-site. | 150 |
| abstract_inverted_index.overcome | 18 |
| abstract_inverted_index.possible | 53 |
| abstract_inverted_index.progress | 39, 56 |
| abstract_inverted_index.projects | 1, 9 |
| abstract_inverted_index.required | 11 |
| abstract_inverted_index.schedule | 78 |
| abstract_inverted_index.Province, | 110 |
| abstract_inverted_index.completed | 14 |
| abstract_inverted_index.conducted | 113 |
| abstract_inverted_index.different | 128 |
| abstract_inverted_index.occurring | 149 |
| abstract_inverted_index.predicted | 141 |
| abstract_inverted_index.problems, | 20 |
| abstract_inverted_index.schedule. | 16, 72 |
| abstract_inverted_index.University | 106 |
| abstract_inverted_index.completed. | 93 |
| abstract_inverted_index.deviations | 69 |
| abstract_inverted_index.management | 23, 48 |
| abstract_inverted_index.prediction | 86 |
| abstract_inverted_index.variations | 79 |
| abstract_inverted_index.performance | 59 |
| abstract_inverted_index.Construction | 0 |
| abstract_inverted_index.Samratulangi | 105 |
| abstract_inverted_index.constraints, | 7 |
| abstract_inverted_index.construction | 29, 96 |
| abstract_inverted_index.performance, | 34 |
| abstract_inverted_index.productivity, | 83 |
| cited_by_percentile_year | |
| countries_distinct_count | 1 |
| institutions_distinct_count | 5 |
| citation_normalized_percentile.value | 0.63154043 |
| citation_normalized_percentile.is_in_top_1_percent | False |
| citation_normalized_percentile.is_in_top_10_percent | True |