Exploring foci of:
Journal La Multiapp • Vol 6 • No 5
Analysis of Implementation Time Performance Using Earned Value Method
October 2025 • Darmawan Pontan, Daniel Daniel, Pentagon Pentagon, Manisha Pathania, Indrawati Sumeru
Construction projects often face cost and time constraints, while projects are required to be completed on schedule. To overcome these problems, an accurate management system is needed in a construction project to measure time performance, which refers to the progress of the work. By applying the earned value management (EVM) method, it is possible to project progress and weekly performance indices, making it easier to evaluate when there are deviations from the schedule. This study aims to analyze schedule variat…
Rolling Stone's 500 Greatest Songs Of All Time
Coordinated Universal Time
Once Upon A Time In America
Greenwich Mean Time
Daylight Saving Time
In Time
Once Upon A Time In The West
The Devil All The Time (Film)
Mountain Time Zone
In Search Of Lost Time
Time Person Of The Year
The Land Before Time (Film)
List Of United States Supreme Court Justices By Time In Office
The Legend Of Zelda: Ocarina Of Time
Waka Waka (This Time For Africa)
The Time Machine
All Time Low
A Wrinkle In Time
List Of Adventure Time Episodes
Just Gets Better With Time
The Ministry Of Time (Novel)
The First Time Ever I Saw Your Face
...Baby One More Time (Album)
Big Time Rush