BIM-Based Construction Scheduling Optimization through Graph Neural Network--Driven Spatial Semantic Reasoning Article Swipe
Wenbo Zhang
,
Zhengtao Wang
,
Zhenqing Yang
,
Zhi Cai
·
YOU?
·
· 2025
· Open Access
·
· DOI: https://doi.org/10.2139/ssrn.5421212
YOU?
·
· 2025
· Open Access
·
· DOI: https://doi.org/10.2139/ssrn.5421212
Related Topics
Concepts
Metadata
- Type
- article
- Language
- en
- Landing Page
- https://doi.org/10.2139/ssrn.5421212
- OA Status
- green
- Related Works
- 10
- OpenAlex ID
- https://openalex.org/W4413850457
All OpenAlex metadata
Raw OpenAlex JSON
- OpenAlex ID
-
https://openalex.org/W4413850457Canonical identifier for this work in OpenAlex
- DOI
-
https://doi.org/10.2139/ssrn.5421212Digital Object Identifier
- Title
-
BIM-Based Construction Scheduling Optimization through Graph Neural Network--Driven Spatial Semantic ReasoningWork title
- Type
-
articleOpenAlex work type
- Language
-
enPrimary language
- Publication year
-
2025Year of publication
- Publication date
-
2025-01-01Full publication date if available
- Authors
-
Wenbo Zhang, Zhengtao Wang, Zhenqing Yang, Zhi CaiList of authors in order
- Landing page
-
https://doi.org/10.2139/ssrn.5421212Publisher landing page
- Open access
-
YesWhether a free full text is available
- OA status
-
greenOpen access status per OpenAlex
- OA URL
-
https://doi.org/10.2139/ssrn.5421212Direct OA link when available
- Concepts
-
Computer science, Scheduling (production processes), Graph, Artificial intelligence, Artificial neural network, Theoretical computer science, Operations management, EngineeringTop concepts (fields/topics) attached by OpenAlex
- Cited by
-
0Total citation count in OpenAlex
- Related works (count)
-
10Other works algorithmically related by OpenAlex
Full payload
| id | https://openalex.org/W4413850457 |
|---|---|
| doi | https://doi.org/10.2139/ssrn.5421212 |
| ids.doi | https://doi.org/10.2139/ssrn.5421212 |
| ids.openalex | https://openalex.org/W4413850457 |
| fwci | 0.0 |
| type | article |
| title | BIM-Based Construction Scheduling Optimization through Graph Neural Network--Driven Spatial Semantic Reasoning |
| biblio.issue | |
| biblio.volume | |
| biblio.last_page | |
| biblio.first_page | |
| topics[0].id | https://openalex.org/T11006 |
| topics[0].field.id | https://openalex.org/fields/22 |
| topics[0].field.display_name | Engineering |
| topics[0].score | 0.9980999827384949 |
| topics[0].domain.id | https://openalex.org/domains/3 |
| topics[0].domain.display_name | Physical Sciences |
| topics[0].subfield.id | https://openalex.org/subfields/2215 |
| topics[0].subfield.display_name | Building and Construction |
| topics[0].display_name | BIM and Construction Integration |
| topics[1].id | https://openalex.org/T11606 |
| topics[1].field.id | https://openalex.org/fields/22 |
| topics[1].field.display_name | Engineering |
| topics[1].score | 0.9341999888420105 |
| topics[1].domain.id | https://openalex.org/domains/3 |
| topics[1].domain.display_name | Physical Sciences |
| topics[1].subfield.id | https://openalex.org/subfields/2205 |
| topics[1].subfield.display_name | Civil and Structural Engineering |
| topics[1].display_name | Infrastructure Maintenance and Monitoring |
| is_xpac | False |
| apc_list | |
| apc_paid | |
| concepts[0].id | https://openalex.org/C41008148 |
| concepts[0].level | 0 |
| concepts[0].score | 0.7322973012924194 |
| concepts[0].wikidata | https://www.wikidata.org/wiki/Q21198 |
| concepts[0].display_name | Computer science |
| concepts[1].id | https://openalex.org/C206729178 |
| concepts[1].level | 2 |
| concepts[1].score | 0.5284117460250854 |
| concepts[1].wikidata | https://www.wikidata.org/wiki/Q2271896 |
| concepts[1].display_name | Scheduling (production processes) |
| concepts[2].id | https://openalex.org/C132525143 |
| concepts[2].level | 2 |
| concepts[2].score | 0.4788091778755188 |
| concepts[2].wikidata | https://www.wikidata.org/wiki/Q141488 |
| concepts[2].display_name | Graph |
| concepts[3].id | https://openalex.org/C154945302 |
| concepts[3].level | 1 |
| concepts[3].score | 0.4780757427215576 |
| concepts[3].wikidata | https://www.wikidata.org/wiki/Q11660 |
| concepts[3].display_name | Artificial intelligence |
| concepts[4].id | https://openalex.org/C50644808 |
| concepts[4].level | 2 |
| concepts[4].score | 0.42164090275764465 |
| concepts[4].wikidata | https://www.wikidata.org/wiki/Q192776 |
| concepts[4].display_name | Artificial neural network |
| concepts[5].id | https://openalex.org/C80444323 |
| concepts[5].level | 1 |
| concepts[5].score | 0.3007887005805969 |
| concepts[5].wikidata | https://www.wikidata.org/wiki/Q2878974 |
| concepts[5].display_name | Theoretical computer science |
| concepts[6].id | https://openalex.org/C21547014 |
| concepts[6].level | 1 |
| concepts[6].score | 0.09101343154907227 |
| concepts[6].wikidata | https://www.wikidata.org/wiki/Q1423657 |
| concepts[6].display_name | Operations management |
| concepts[7].id | https://openalex.org/C127413603 |
| concepts[7].level | 0 |
| concepts[7].score | 0.08688578009605408 |
| concepts[7].wikidata | https://www.wikidata.org/wiki/Q11023 |
| concepts[7].display_name | Engineering |
| keywords[0].id | https://openalex.org/keywords/computer-science |
| keywords[0].score | 0.7322973012924194 |
| keywords[0].display_name | Computer science |
| keywords[1].id | https://openalex.org/keywords/scheduling |
| keywords[1].score | 0.5284117460250854 |
| keywords[1].display_name | Scheduling (production processes) |
| keywords[2].id | https://openalex.org/keywords/graph |
| keywords[2].score | 0.4788091778755188 |
| keywords[2].display_name | Graph |
| keywords[3].id | https://openalex.org/keywords/artificial-intelligence |
| keywords[3].score | 0.4780757427215576 |
| keywords[3].display_name | Artificial intelligence |
| keywords[4].id | https://openalex.org/keywords/artificial-neural-network |
| keywords[4].score | 0.42164090275764465 |
| keywords[4].display_name | Artificial neural network |
| keywords[5].id | https://openalex.org/keywords/theoretical-computer-science |
| keywords[5].score | 0.3007887005805969 |
| keywords[5].display_name | Theoretical computer science |
| keywords[6].id | https://openalex.org/keywords/operations-management |
| keywords[6].score | 0.09101343154907227 |
| keywords[6].display_name | Operations management |
| keywords[7].id | https://openalex.org/keywords/engineering |
| keywords[7].score | 0.08688578009605408 |
| keywords[7].display_name | Engineering |
| language | en |
| locations[0].id | doi:10.2139/ssrn.5421212 |
| locations[0].is_oa | True |
| locations[0].source.id | https://openalex.org/S4210172589 |
| locations[0].source.issn | 1556-5068 |
| locations[0].source.type | repository |
| locations[0].source.is_oa | True |
| locations[0].source.issn_l | 1556-5068 |
| locations[0].source.is_core | False |
| locations[0].source.is_in_doaj | False |
| locations[0].source.display_name | SSRN Electronic Journal |
| locations[0].source.host_organization | https://openalex.org/I1318003438 |
| locations[0].source.host_organization_name | RELX Group (Netherlands) |
| locations[0].source.host_organization_lineage | https://openalex.org/I1318003438 |
| locations[0].license | |
| locations[0].pdf_url | |
| locations[0].version | acceptedVersion |
| locations[0].raw_type | posted-content |
| locations[0].license_id | |
| locations[0].is_accepted | True |
| locations[0].is_published | False |
| locations[0].raw_source_name | |
| locations[0].landing_page_url | https://doi.org/10.2139/ssrn.5421212 |
| indexed_in | crossref |
| authorships[0].author.id | https://openalex.org/A5106342647 |
| authorships[0].author.orcid | https://orcid.org/0009-0000-5211-9730 |
| authorships[0].author.display_name | Wenbo Zhang |
| authorships[0].author_position | first |
| authorships[0].raw_author_name | Wenbo Zhang |
| authorships[0].is_corresponding | False |
| authorships[1].author.id | https://openalex.org/A5100601073 |
| authorships[1].author.orcid | https://orcid.org/0000-0003-2797-4625 |
| authorships[1].author.display_name | Zhengtao Wang |
| authorships[1].author_position | middle |
| authorships[1].raw_author_name | ZhengTao Wang |
| authorships[1].is_corresponding | False |
| authorships[2].author.id | https://openalex.org/A5013579713 |
| authorships[2].author.orcid | https://orcid.org/0000-0001-7453-2761 |
| authorships[2].author.display_name | Zhenqing Yang |
| authorships[2].author_position | middle |
| authorships[2].raw_author_name | Zhenqing Yang |
| authorships[2].is_corresponding | False |
| authorships[3].author.id | https://openalex.org/A5033214557 |
| authorships[3].author.orcid | https://orcid.org/0000-0001-8033-6900 |
| authorships[3].author.display_name | Zhi Cai |
| authorships[3].author_position | last |
| authorships[3].raw_author_name | Zhi Cai |
| authorships[3].is_corresponding | False |
| has_content.pdf | False |
| has_content.grobid_xml | False |
| is_paratext | False |
| open_access.is_oa | True |
| open_access.oa_url | https://doi.org/10.2139/ssrn.5421212 |
| open_access.oa_status | green |
| open_access.any_repository_has_fulltext | False |
| created_date | 2025-10-10T00:00:00 |
| display_name | BIM-Based Construction Scheduling Optimization through Graph Neural Network--Driven Spatial Semantic Reasoning |
| has_fulltext | False |
| is_retracted | False |
| updated_date | 2025-11-06T03:46:38.306776 |
| primary_topic.id | https://openalex.org/T11006 |
| primary_topic.field.id | https://openalex.org/fields/22 |
| primary_topic.field.display_name | Engineering |
| primary_topic.score | 0.9980999827384949 |
| primary_topic.domain.id | https://openalex.org/domains/3 |
| primary_topic.domain.display_name | Physical Sciences |
| primary_topic.subfield.id | https://openalex.org/subfields/2215 |
| primary_topic.subfield.display_name | Building and Construction |
| primary_topic.display_name | BIM and Construction Integration |
| related_works | https://openalex.org/W2391251536, https://openalex.org/W2362198218, https://openalex.org/W2019521278, https://openalex.org/W1984922432, https://openalex.org/W2375008505, https://openalex.org/W1982750869, https://openalex.org/W2085756966, https://openalex.org/W2350679292, https://openalex.org/W2086348228, https://openalex.org/W4390653028 |
| cited_by_count | 0 |
| locations_count | 1 |
| best_oa_location.id | doi:10.2139/ssrn.5421212 |
| best_oa_location.is_oa | True |
| best_oa_location.source.id | https://openalex.org/S4210172589 |
| best_oa_location.source.issn | 1556-5068 |
| best_oa_location.source.type | repository |
| best_oa_location.source.is_oa | True |
| best_oa_location.source.issn_l | 1556-5068 |
| best_oa_location.source.is_core | False |
| best_oa_location.source.is_in_doaj | False |
| best_oa_location.source.display_name | SSRN Electronic Journal |
| best_oa_location.source.host_organization | https://openalex.org/I1318003438 |
| best_oa_location.source.host_organization_name | RELX Group (Netherlands) |
| best_oa_location.source.host_organization_lineage | https://openalex.org/I1318003438 |
| best_oa_location.license | |
| best_oa_location.pdf_url | |
| best_oa_location.version | acceptedVersion |
| best_oa_location.raw_type | posted-content |
| best_oa_location.license_id | |
| best_oa_location.is_accepted | True |
| best_oa_location.is_published | False |
| best_oa_location.raw_source_name | |
| best_oa_location.landing_page_url | https://doi.org/10.2139/ssrn.5421212 |
| primary_location.id | doi:10.2139/ssrn.5421212 |
| primary_location.is_oa | True |
| primary_location.source.id | https://openalex.org/S4210172589 |
| primary_location.source.issn | 1556-5068 |
| primary_location.source.type | repository |
| primary_location.source.is_oa | True |
| primary_location.source.issn_l | 1556-5068 |
| primary_location.source.is_core | False |
| primary_location.source.is_in_doaj | False |
| primary_location.source.display_name | SSRN Electronic Journal |
| primary_location.source.host_organization | https://openalex.org/I1318003438 |
| primary_location.source.host_organization_name | RELX Group (Netherlands) |
| primary_location.source.host_organization_lineage | https://openalex.org/I1318003438 |
| primary_location.license | |
| primary_location.pdf_url | |
| primary_location.version | acceptedVersion |
| primary_location.raw_type | posted-content |
| primary_location.license_id | |
| primary_location.is_accepted | True |
| primary_location.is_published | False |
| primary_location.raw_source_name | |
| primary_location.landing_page_url | https://doi.org/10.2139/ssrn.5421212 |
| publication_date | 2025-01-01 |
| publication_year | 2025 |
| referenced_works_count | 0 |
| abstract_inverted_index | |
| cited_by_percentile_year | |
| countries_distinct_count | 0 |
| institutions_distinct_count | 4 |
| citation_normalized_percentile.value | 0.44501444 |
| citation_normalized_percentile.is_in_top_1_percent | False |
| citation_normalized_percentile.is_in_top_10_percent | False |