Computation of static stresses of the head cover bolts in a pump turbine Article Swipe
Related Concepts
Head (geology)
Structural engineering
Stiffness
Preload
Turbine
Stress (linguistics)
Ring (chemistry)
Cover (algebra)
Engineering
Pressure head
Position (finance)
Materials science
Geotechnical engineering
Mechanical engineering
Geology
Economics
Hemodynamics
Philosophy
Finance
Chemistry
Medicine
Internal medicine
Organic chemistry
Linguistics
Geomorphology
Funan Chen
,
Liu Chen
,
Zhengwei Wang
,
Jixing Yu
,
Chengzong Luo
,
Zhiwen Zhao
,
Shaocheng Ren
,
Jinwei Li
,
Dezhi Deng
·
YOU?
·
· 2019
· Open Access
·
· DOI: https://doi.org/10.1088/1757-899x/493/1/012143
· OA: W2979319164
YOU?
·
· 2019
· Open Access
·
· DOI: https://doi.org/10.1088/1757-899x/493/1/012143
· OA: W2979319164
The static stress of bolts connecting head cover and stay ring in a pump turbine has been analyzed through ANSYS. The 3D flow of the pump turbine was simulated to get the pressure on head cover and stay ring. The stresses of bolts under 2 loading conditions were calculated: preload only as well as both preload and hydraulic pressure. Results showed that the stress of bolts was greater than head cover and stay ring. Stress concentration of bolts appeared at the position where diameter changed. Due to the influence of hydraulic pressure, the stress of bolts became larger. Head cover and stay ring deformed at the position where stiffness was poor.
Related Topics
Finding more related topics…