Delay Analysis for End-to-End Synchronous Communication in Monitoring Systems Article Swipe
YOU?
·
· 2018
· Open Access
·
· DOI: https://doi.org/10.3390/s18113615
With the rapid development of smart grid technologies, communication systems are further integrated in the existing power grids. The real-time capability and reliability of the power applications are receiving increasing concerns. Thus, it is important to measure the end-to-end delay in communication systems. The network calculus theory has been widely applied in the communication delay measuring tasks. However, for better operation performance of power systems, most power applications require synchronous data communication, in which the network calculus theory cannot be directly applied. In this paper, we expand the network calculus theory such that it can be used to analyze the communication delay for power applications in smart grids. The problem of communication delay calculation for the synchronization system is converted into a maximum path problem in graph theory. Finally, our theoretical results are compared with the experimental ones obtained with the network simulation software EstiNet. The simulation results verify the feasibility and effectiveness of the proposed method.
Related Topics
- Type
- article
- Language
- en
- Landing Page
- https://doi.org/10.3390/s18113615
- https://www.mdpi.com/1424-8220/18/11/3615/pdf?version=1540450394
- OA Status
- gold
- Cited By
- 8
- References
- 22
- Related Works
- 10
- OpenAlex ID
- https://openalex.org/W2898100625
Raw OpenAlex JSON
- OpenAlex ID
-
https://openalex.org/W2898100625Canonical identifier for this work in OpenAlex
- DOI
-
https://doi.org/10.3390/s18113615Digital Object Identifier
- Title
-
Delay Analysis for End-to-End Synchronous Communication in Monitoring SystemsWork title
- Type
-
articleOpenAlex work type
- Language
-
enPrimary language
- Publication year
-
2018Year of publication
- Publication date
-
2018-10-24Full publication date if available
- Authors
-
Junwei Cao, Yuxin Wan, Haochen Hua, Yuchao QinList of authors in order
- Landing page
-
https://doi.org/10.3390/s18113615Publisher landing page
- PDF URL
-
https://www.mdpi.com/1424-8220/18/11/3615/pdf?version=1540450394Direct link to full text PDF
- Open access
-
YesWhether a free full text is available
- OA status
-
goldOpen access status per OpenAlex
- OA URL
-
https://www.mdpi.com/1424-8220/18/11/3615/pdf?version=1540450394Direct OA link when available
- Concepts
-
Network calculus, Computer science, Reliability (semiconductor), Synchronization (alternating current), Telecommunications network, Smart grid, Communications system, Graph theory, Electric power system, Communications protocol, Power (physics), Distributed computing, Computer network, Engineering, Quality of service, Electrical engineering, Mathematics, Combinatorics, Quantum mechanics, Physics, Channel (broadcasting)Top concepts (fields/topics) attached by OpenAlex
- Cited by
-
8Total citation count in OpenAlex
- Citations by year (recent)
-
2022: 2, 2020: 1, 2019: 5Per-year citation counts (last 5 years)
- References (count)
-
22Number of works referenced by this work
- Related works (count)
-
10Other works algorithmically related by OpenAlex
Full payload
| id | https://openalex.org/W2898100625 |
|---|---|
| doi | https://doi.org/10.3390/s18113615 |
| ids.doi | https://doi.org/10.3390/s18113615 |
| ids.mag | 2898100625 |
| ids.pmid | https://pubmed.ncbi.nlm.nih.gov/30356022 |
| ids.openalex | https://openalex.org/W2898100625 |
| fwci | 1.14389321 |
| type | article |
| title | Delay Analysis for End-to-End Synchronous Communication in Monitoring Systems |
| biblio.issue | 11 |
| biblio.volume | 18 |
| biblio.last_page | 3615 |
| biblio.first_page | 3615 |
| topics[0].id | https://openalex.org/T10917 |
| topics[0].field.id | https://openalex.org/fields/22 |
| topics[0].field.display_name | Engineering |
| topics[0].score | 0.9948999881744385 |
| topics[0].domain.id | https://openalex.org/domains/3 |
| topics[0].domain.display_name | Physical Sciences |
| topics[0].subfield.id | https://openalex.org/subfields/2207 |
| topics[0].subfield.display_name | Control and Systems Engineering |
| topics[0].display_name | Smart Grid Security and Resilience |
| topics[1].id | https://openalex.org/T10715 |
| topics[1].field.id | https://openalex.org/fields/17 |
| topics[1].field.display_name | Computer Science |
| topics[1].score | 0.9933000206947327 |
| topics[1].domain.id | https://openalex.org/domains/3 |
| topics[1].domain.display_name | Physical Sciences |
| topics[1].subfield.id | https://openalex.org/subfields/1705 |
| topics[1].subfield.display_name | Computer Networks and Communications |
| topics[1].display_name | Distributed and Parallel Computing Systems |
| topics[2].id | https://openalex.org/T12216 |
| topics[2].field.id | https://openalex.org/fields/17 |
| topics[2].field.display_name | Computer Science |
| topics[2].score | 0.9692999720573425 |
| topics[2].domain.id | https://openalex.org/domains/3 |
| topics[2].domain.display_name | Physical Sciences |
| topics[2].subfield.id | https://openalex.org/subfields/1705 |
| topics[2].subfield.display_name | Computer Networks and Communications |
| topics[2].display_name | Network Time Synchronization Technologies |
| is_xpac | False |
| apc_list.value | 2400 |
| apc_list.currency | CHF |
| apc_list.value_usd | 2598 |
| apc_paid.value | 2400 |
| apc_paid.currency | CHF |
| apc_paid.value_usd | 2598 |
| concepts[0].id | https://openalex.org/C2778693205 |
| concepts[0].level | 3 |
| concepts[0].score | 0.909027099609375 |
| concepts[0].wikidata | https://www.wikidata.org/wiki/Q7000967 |
| concepts[0].display_name | Network calculus |
| concepts[1].id | https://openalex.org/C41008148 |
| concepts[1].level | 0 |
| concepts[1].score | 0.7000533938407898 |
| concepts[1].wikidata | https://www.wikidata.org/wiki/Q21198 |
| concepts[1].display_name | Computer science |
| concepts[2].id | https://openalex.org/C43214815 |
| concepts[2].level | 3 |
| concepts[2].score | 0.579557478427887 |
| concepts[2].wikidata | https://www.wikidata.org/wiki/Q7310987 |
| concepts[2].display_name | Reliability (semiconductor) |
| concepts[3].id | https://openalex.org/C2778562939 |
| concepts[3].level | 3 |
| concepts[3].score | 0.5742308497428894 |
| concepts[3].wikidata | https://www.wikidata.org/wiki/Q1298791 |
| concepts[3].display_name | Synchronization (alternating current) |
| concepts[4].id | https://openalex.org/C192126672 |
| concepts[4].level | 2 |
| concepts[4].score | 0.5571670532226562 |
| concepts[4].wikidata | https://www.wikidata.org/wiki/Q1068715 |
| concepts[4].display_name | Telecommunications network |
| concepts[5].id | https://openalex.org/C10558101 |
| concepts[5].level | 2 |
| concepts[5].score | 0.5542308688163757 |
| concepts[5].wikidata | https://www.wikidata.org/wiki/Q689855 |
| concepts[5].display_name | Smart grid |
| concepts[6].id | https://openalex.org/C101765175 |
| concepts[6].level | 2 |
| concepts[6].score | 0.4904913306236267 |
| concepts[6].wikidata | https://www.wikidata.org/wiki/Q577764 |
| concepts[6].display_name | Communications system |
| concepts[7].id | https://openalex.org/C88230418 |
| concepts[7].level | 2 |
| concepts[7].score | 0.4546549320220947 |
| concepts[7].wikidata | https://www.wikidata.org/wiki/Q131476 |
| concepts[7].display_name | Graph theory |
| concepts[8].id | https://openalex.org/C89227174 |
| concepts[8].level | 3 |
| concepts[8].score | 0.42533108592033386 |
| concepts[8].wikidata | https://www.wikidata.org/wiki/Q2388981 |
| concepts[8].display_name | Electric power system |
| concepts[9].id | https://openalex.org/C12269588 |
| concepts[9].level | 2 |
| concepts[9].score | 0.41543838381767273 |
| concepts[9].wikidata | https://www.wikidata.org/wiki/Q132364 |
| concepts[9].display_name | Communications protocol |
| concepts[10].id | https://openalex.org/C163258240 |
| concepts[10].level | 2 |
| concepts[10].score | 0.37761104106903076 |
| concepts[10].wikidata | https://www.wikidata.org/wiki/Q25342 |
| concepts[10].display_name | Power (physics) |
| concepts[11].id | https://openalex.org/C120314980 |
| concepts[11].level | 1 |
| concepts[11].score | 0.37376198172569275 |
| concepts[11].wikidata | https://www.wikidata.org/wiki/Q180634 |
| concepts[11].display_name | Distributed computing |
| concepts[12].id | https://openalex.org/C31258907 |
| concepts[12].level | 1 |
| concepts[12].score | 0.24055394530296326 |
| concepts[12].wikidata | https://www.wikidata.org/wiki/Q1301371 |
| concepts[12].display_name | Computer network |
| concepts[13].id | https://openalex.org/C127413603 |
| concepts[13].level | 0 |
| concepts[13].score | 0.16461649537086487 |
| concepts[13].wikidata | https://www.wikidata.org/wiki/Q11023 |
| concepts[13].display_name | Engineering |
| concepts[14].id | https://openalex.org/C5119721 |
| concepts[14].level | 2 |
| concepts[14].score | 0.14150545001029968 |
| concepts[14].wikidata | https://www.wikidata.org/wiki/Q220501 |
| concepts[14].display_name | Quality of service |
| concepts[15].id | https://openalex.org/C119599485 |
| concepts[15].level | 1 |
| concepts[15].score | 0.13301891088485718 |
| concepts[15].wikidata | https://www.wikidata.org/wiki/Q43035 |
| concepts[15].display_name | Electrical engineering |
| concepts[16].id | https://openalex.org/C33923547 |
| concepts[16].level | 0 |
| concepts[16].score | 0.09440881013870239 |
| concepts[16].wikidata | https://www.wikidata.org/wiki/Q395 |
| concepts[16].display_name | Mathematics |
| concepts[17].id | https://openalex.org/C114614502 |
| concepts[17].level | 1 |
| concepts[17].score | 0.0 |
| concepts[17].wikidata | https://www.wikidata.org/wiki/Q76592 |
| concepts[17].display_name | Combinatorics |
| concepts[18].id | https://openalex.org/C62520636 |
| concepts[18].level | 1 |
| concepts[18].score | 0.0 |
| concepts[18].wikidata | https://www.wikidata.org/wiki/Q944 |
| concepts[18].display_name | Quantum mechanics |
| concepts[19].id | https://openalex.org/C121332964 |
| concepts[19].level | 0 |
| concepts[19].score | 0.0 |
| concepts[19].wikidata | https://www.wikidata.org/wiki/Q413 |
| concepts[19].display_name | Physics |
| concepts[20].id | https://openalex.org/C127162648 |
| concepts[20].level | 2 |
| concepts[20].score | 0.0 |
| concepts[20].wikidata | https://www.wikidata.org/wiki/Q16858953 |
| concepts[20].display_name | Channel (broadcasting) |
| keywords[0].id | https://openalex.org/keywords/network-calculus |
| keywords[0].score | 0.909027099609375 |
| keywords[0].display_name | Network calculus |
| keywords[1].id | https://openalex.org/keywords/computer-science |
| keywords[1].score | 0.7000533938407898 |
| keywords[1].display_name | Computer science |
| keywords[2].id | https://openalex.org/keywords/reliability |
| keywords[2].score | 0.579557478427887 |
| keywords[2].display_name | Reliability (semiconductor) |
| keywords[3].id | https://openalex.org/keywords/synchronization |
| keywords[3].score | 0.5742308497428894 |
| keywords[3].display_name | Synchronization (alternating current) |
| keywords[4].id | https://openalex.org/keywords/telecommunications-network |
| keywords[4].score | 0.5571670532226562 |
| keywords[4].display_name | Telecommunications network |
| keywords[5].id | https://openalex.org/keywords/smart-grid |
| keywords[5].score | 0.5542308688163757 |
| keywords[5].display_name | Smart grid |
| keywords[6].id | https://openalex.org/keywords/communications-system |
| keywords[6].score | 0.4904913306236267 |
| keywords[6].display_name | Communications system |
| keywords[7].id | https://openalex.org/keywords/graph-theory |
| keywords[7].score | 0.4546549320220947 |
| keywords[7].display_name | Graph theory |
| keywords[8].id | https://openalex.org/keywords/electric-power-system |
| keywords[8].score | 0.42533108592033386 |
| keywords[8].display_name | Electric power system |
| keywords[9].id | https://openalex.org/keywords/communications-protocol |
| keywords[9].score | 0.41543838381767273 |
| keywords[9].display_name | Communications protocol |
| keywords[10].id | https://openalex.org/keywords/power |
| keywords[10].score | 0.37761104106903076 |
| keywords[10].display_name | Power (physics) |
| keywords[11].id | https://openalex.org/keywords/distributed-computing |
| keywords[11].score | 0.37376198172569275 |
| keywords[11].display_name | Distributed computing |
| keywords[12].id | https://openalex.org/keywords/computer-network |
| keywords[12].score | 0.24055394530296326 |
| keywords[12].display_name | Computer network |
| keywords[13].id | https://openalex.org/keywords/engineering |
| keywords[13].score | 0.16461649537086487 |
| keywords[13].display_name | Engineering |
| keywords[14].id | https://openalex.org/keywords/quality-of-service |
| keywords[14].score | 0.14150545001029968 |
| keywords[14].display_name | Quality of service |
| keywords[15].id | https://openalex.org/keywords/electrical-engineering |
| keywords[15].score | 0.13301891088485718 |
| keywords[15].display_name | Electrical engineering |
| keywords[16].id | https://openalex.org/keywords/mathematics |
| keywords[16].score | 0.09440881013870239 |
| keywords[16].display_name | Mathematics |
| language | en |
| locations[0].id | doi:10.3390/s18113615 |
| locations[0].is_oa | True |
| locations[0].source.id | https://openalex.org/S101949793 |
| locations[0].source.issn | 1424-8220 |
| locations[0].source.type | journal |
| locations[0].source.is_oa | True |
| locations[0].source.issn_l | 1424-8220 |
| locations[0].source.is_core | True |
| locations[0].source.is_in_doaj | True |
| locations[0].source.display_name | Sensors |
| locations[0].source.host_organization | https://openalex.org/P4310310987 |
| locations[0].source.host_organization_name | Multidisciplinary Digital Publishing Institute |
| locations[0].source.host_organization_lineage | https://openalex.org/P4310310987 |
| locations[0].source.host_organization_lineage_names | Multidisciplinary Digital Publishing Institute |
| locations[0].license | cc-by |
| locations[0].pdf_url | https://www.mdpi.com/1424-8220/18/11/3615/pdf?version=1540450394 |
| locations[0].version | publishedVersion |
| locations[0].raw_type | journal-article |
| locations[0].license_id | https://openalex.org/licenses/cc-by |
| locations[0].is_accepted | True |
| locations[0].is_published | True |
| locations[0].raw_source_name | Sensors |
| locations[0].landing_page_url | https://doi.org/10.3390/s18113615 |
| locations[1].id | pmid:30356022 |
| locations[1].is_oa | False |
| locations[1].source.id | https://openalex.org/S4306525036 |
| locations[1].source.issn | |
| locations[1].source.type | repository |
| locations[1].source.is_oa | False |
| locations[1].source.issn_l | |
| locations[1].source.is_core | False |
| locations[1].source.is_in_doaj | False |
| locations[1].source.display_name | PubMed |
| locations[1].source.host_organization | https://openalex.org/I1299303238 |
| locations[1].source.host_organization_name | National Institutes of Health |
| locations[1].source.host_organization_lineage | https://openalex.org/I1299303238 |
| locations[1].license | |
| locations[1].pdf_url | |
| locations[1].version | publishedVersion |
| locations[1].raw_type | |
| locations[1].license_id | |
| locations[1].is_accepted | True |
| locations[1].is_published | True |
| locations[1].raw_source_name | Sensors (Basel, Switzerland) |
| locations[1].landing_page_url | https://pubmed.ncbi.nlm.nih.gov/30356022 |
| locations[2].id | pmh:oai:doaj.org/article:b7f4bc1be07145f0b5d88f5382da85ef |
| locations[2].is_oa | True |
| locations[2].source.id | https://openalex.org/S4306401280 |
| locations[2].source.issn | |
| locations[2].source.type | repository |
| locations[2].source.is_oa | False |
| locations[2].source.issn_l | |
| locations[2].source.is_core | False |
| locations[2].source.is_in_doaj | False |
| locations[2].source.display_name | DOAJ (DOAJ: Directory of Open Access Journals) |
| locations[2].source.host_organization | |
| locations[2].source.host_organization_name | |
| locations[2].license | cc-by-sa |
| locations[2].pdf_url | |
| locations[2].version | submittedVersion |
| locations[2].raw_type | article |
| locations[2].license_id | https://openalex.org/licenses/cc-by-sa |
| locations[2].is_accepted | False |
| locations[2].is_published | False |
| locations[2].raw_source_name | Sensors, Vol 18, Iss 11, p 3615 (2018) |
| locations[2].landing_page_url | https://doaj.org/article/b7f4bc1be07145f0b5d88f5382da85ef |
| locations[3].id | pmh:oai:europepmc.org:5257784 |
| locations[3].is_oa | True |
| locations[3].source.id | https://openalex.org/S4306400806 |
| locations[3].source.issn | |
| locations[3].source.type | repository |
| locations[3].source.is_oa | False |
| locations[3].source.issn_l | |
| locations[3].source.is_core | False |
| locations[3].source.is_in_doaj | False |
| locations[3].source.display_name | Europe PMC (PubMed Central) |
| locations[3].source.host_organization | https://openalex.org/I1303153112 |
| locations[3].source.host_organization_name | European Bioinformatics Institute |
| locations[3].source.host_organization_lineage | https://openalex.org/I1303153112 |
| locations[3].license | other-oa |
| locations[3].pdf_url | |
| locations[3].version | submittedVersion |
| locations[3].raw_type | Text |
| locations[3].license_id | https://openalex.org/licenses/other-oa |
| locations[3].is_accepted | False |
| locations[3].is_published | False |
| locations[3].raw_source_name | |
| locations[3].landing_page_url | http://europepmc.org/pmc/articles/PMC6263762 |
| locations[4].id | pmh:oai:mdpi.com:/1424-8220/18/11/3615/ |
| locations[4].is_oa | True |
| locations[4].source.id | https://openalex.org/S4306400947 |
| locations[4].source.issn | |
| locations[4].source.type | repository |
| locations[4].source.is_oa | True |
| locations[4].source.issn_l | |
| locations[4].source.is_core | False |
| locations[4].source.is_in_doaj | False |
| locations[4].source.display_name | MDPI (MDPI AG) |
| locations[4].source.host_organization | https://openalex.org/I4210097602 |
| locations[4].source.host_organization_name | Multidisciplinary Digital Publishing Institute (Switzerland) |
| locations[4].source.host_organization_lineage | https://openalex.org/I4210097602 |
| locations[4].license | cc-by |
| locations[4].pdf_url | |
| locations[4].version | submittedVersion |
| locations[4].raw_type | Text |
| locations[4].license_id | https://openalex.org/licenses/cc-by |
| locations[4].is_accepted | False |
| locations[4].is_published | False |
| locations[4].raw_source_name | Sensors |
| locations[4].landing_page_url | http://dx.doi.org/10.3390/s18113615 |
| locations[5].id | pmh:oai:pubmedcentral.nih.gov:6263762 |
| locations[5].is_oa | True |
| locations[5].source.id | https://openalex.org/S2764455111 |
| locations[5].source.issn | |
| locations[5].source.type | repository |
| locations[5].source.is_oa | False |
| locations[5].source.issn_l | |
| locations[5].source.is_core | False |
| locations[5].source.is_in_doaj | False |
| locations[5].source.display_name | PubMed Central |
| locations[5].source.host_organization | https://openalex.org/I1299303238 |
| locations[5].source.host_organization_name | National Institutes of Health |
| locations[5].source.host_organization_lineage | https://openalex.org/I1299303238 |
| locations[5].license | other-oa |
| locations[5].pdf_url | |
| locations[5].version | submittedVersion |
| locations[5].raw_type | Text |
| locations[5].license_id | https://openalex.org/licenses/other-oa |
| locations[5].is_accepted | False |
| locations[5].is_published | False |
| locations[5].raw_source_name | Sensors (Basel) |
| locations[5].landing_page_url | https://www.ncbi.nlm.nih.gov/pmc/articles/6263762 |
| indexed_in | crossref, doaj, pubmed |
| authorships[0].author.id | https://openalex.org/A5003512698 |
| authorships[0].author.orcid | https://orcid.org/0000-0002-5219-9766 |
| authorships[0].author.display_name | Junwei Cao |
| authorships[0].countries | CN |
| authorships[0].affiliations[0].institution_ids | https://openalex.org/I99065089 |
| authorships[0].affiliations[0].raw_affiliation_string | Research Institute of Information Technology, Tsinghua University, Beijing 100084, China |
| authorships[0].institutions[0].id | https://openalex.org/I99065089 |
| authorships[0].institutions[0].ror | https://ror.org/03cve4549 |
| authorships[0].institutions[0].type | education |
| authorships[0].institutions[0].lineage | https://openalex.org/I99065089 |
| authorships[0].institutions[0].country_code | CN |
| authorships[0].institutions[0].display_name | Tsinghua University |
| authorships[0].author_position | first |
| authorships[0].raw_author_name | Junwei Cao |
| authorships[0].is_corresponding | False |
| authorships[0].raw_affiliation_strings | Research Institute of Information Technology, Tsinghua University, Beijing 100084, China |
| authorships[1].author.id | https://openalex.org/A5088938267 |
| authorships[1].author.orcid | https://orcid.org/0000-0002-3664-7741 |
| authorships[1].author.display_name | Yuxin Wan |
| authorships[1].countries | CN |
| authorships[1].affiliations[0].institution_ids | https://openalex.org/I99065089 |
| authorships[1].affiliations[0].raw_affiliation_string | Research Institute of Information Technology, Tsinghua University, Beijing 100084, China |
| authorships[1].institutions[0].id | https://openalex.org/I99065089 |
| authorships[1].institutions[0].ror | https://ror.org/03cve4549 |
| authorships[1].institutions[0].type | education |
| authorships[1].institutions[0].lineage | https://openalex.org/I99065089 |
| authorships[1].institutions[0].country_code | CN |
| authorships[1].institutions[0].display_name | Tsinghua University |
| authorships[1].author_position | middle |
| authorships[1].raw_author_name | Yuxin Wan |
| authorships[1].is_corresponding | False |
| authorships[1].raw_affiliation_strings | Research Institute of Information Technology, Tsinghua University, Beijing 100084, China |
| authorships[2].author.id | https://openalex.org/A5100767396 |
| authorships[2].author.orcid | https://orcid.org/0000-0002-3341-2947 |
| authorships[2].author.display_name | Haochen Hua |
| authorships[2].countries | CN |
| authorships[2].affiliations[0].institution_ids | https://openalex.org/I99065089 |
| authorships[2].affiliations[0].raw_affiliation_string | Research Institute of Information Technology, Tsinghua University, Beijing 100084, China |
| authorships[2].institutions[0].id | https://openalex.org/I99065089 |
| authorships[2].institutions[0].ror | https://ror.org/03cve4549 |
| authorships[2].institutions[0].type | education |
| authorships[2].institutions[0].lineage | https://openalex.org/I99065089 |
| authorships[2].institutions[0].country_code | CN |
| authorships[2].institutions[0].display_name | Tsinghua University |
| authorships[2].author_position | middle |
| authorships[2].raw_author_name | Haochen Hua |
| authorships[2].is_corresponding | True |
| authorships[2].raw_affiliation_strings | Research Institute of Information Technology, Tsinghua University, Beijing 100084, China |
| authorships[3].author.id | https://openalex.org/A5011810807 |
| authorships[3].author.orcid | https://orcid.org/0000-0003-0396-5142 |
| authorships[3].author.display_name | Yuchao Qin |
| authorships[3].countries | CN |
| authorships[3].affiliations[0].institution_ids | https://openalex.org/I99065089 |
| authorships[3].affiliations[0].raw_affiliation_string | Research Institute of Information Technology, Tsinghua University, Beijing 100084, China |
| authorships[3].institutions[0].id | https://openalex.org/I99065089 |
| authorships[3].institutions[0].ror | https://ror.org/03cve4549 |
| authorships[3].institutions[0].type | education |
| authorships[3].institutions[0].lineage | https://openalex.org/I99065089 |
| authorships[3].institutions[0].country_code | CN |
| authorships[3].institutions[0].display_name | Tsinghua University |
| authorships[3].author_position | last |
| authorships[3].raw_author_name | Yuchao Qin |
| authorships[3].is_corresponding | False |
| authorships[3].raw_affiliation_strings | Research Institute of Information Technology, Tsinghua University, Beijing 100084, China |
| has_content.pdf | True |
| has_content.grobid_xml | True |
| is_paratext | False |
| open_access.is_oa | True |
| open_access.oa_url | https://www.mdpi.com/1424-8220/18/11/3615/pdf?version=1540450394 |
| open_access.oa_status | gold |
| open_access.any_repository_has_fulltext | False |
| created_date | 2025-10-10T00:00:00 |
| display_name | Delay Analysis for End-to-End Synchronous Communication in Monitoring Systems |
| has_fulltext | True |
| is_retracted | False |
| updated_date | 2025-11-06T03:46:38.306776 |
| primary_topic.id | https://openalex.org/T10917 |
| primary_topic.field.id | https://openalex.org/fields/22 |
| primary_topic.field.display_name | Engineering |
| primary_topic.score | 0.9948999881744385 |
| primary_topic.domain.id | https://openalex.org/domains/3 |
| primary_topic.domain.display_name | Physical Sciences |
| primary_topic.subfield.id | https://openalex.org/subfields/2207 |
| primary_topic.subfield.display_name | Control and Systems Engineering |
| primary_topic.display_name | Smart Grid Security and Resilience |
| related_works | https://openalex.org/W2008379584, https://openalex.org/W2374589657, https://openalex.org/W2981434560, https://openalex.org/W2541781117, https://openalex.org/W2361761667, https://openalex.org/W2066376469, https://openalex.org/W2359236848, https://openalex.org/W2379228049, https://openalex.org/W2168431997, https://openalex.org/W2081965607 |
| cited_by_count | 8 |
| counts_by_year[0].year | 2022 |
| counts_by_year[0].cited_by_count | 2 |
| counts_by_year[1].year | 2020 |
| counts_by_year[1].cited_by_count | 1 |
| counts_by_year[2].year | 2019 |
| counts_by_year[2].cited_by_count | 5 |
| locations_count | 6 |
| best_oa_location.id | doi:10.3390/s18113615 |
| best_oa_location.is_oa | True |
| best_oa_location.source.id | https://openalex.org/S101949793 |
| best_oa_location.source.issn | 1424-8220 |
| best_oa_location.source.type | journal |
| best_oa_location.source.is_oa | True |
| best_oa_location.source.issn_l | 1424-8220 |
| best_oa_location.source.is_core | True |
| best_oa_location.source.is_in_doaj | True |
| best_oa_location.source.display_name | Sensors |
| best_oa_location.source.host_organization | https://openalex.org/P4310310987 |
| best_oa_location.source.host_organization_name | Multidisciplinary Digital Publishing Institute |
| best_oa_location.source.host_organization_lineage | https://openalex.org/P4310310987 |
| best_oa_location.source.host_organization_lineage_names | Multidisciplinary Digital Publishing Institute |
| best_oa_location.license | cc-by |
| best_oa_location.pdf_url | https://www.mdpi.com/1424-8220/18/11/3615/pdf?version=1540450394 |
| best_oa_location.version | publishedVersion |
| best_oa_location.raw_type | journal-article |
| best_oa_location.license_id | https://openalex.org/licenses/cc-by |
| best_oa_location.is_accepted | True |
| best_oa_location.is_published | True |
| best_oa_location.raw_source_name | Sensors |
| best_oa_location.landing_page_url | https://doi.org/10.3390/s18113615 |
| primary_location.id | doi:10.3390/s18113615 |
| primary_location.is_oa | True |
| primary_location.source.id | https://openalex.org/S101949793 |
| primary_location.source.issn | 1424-8220 |
| primary_location.source.type | journal |
| primary_location.source.is_oa | True |
| primary_location.source.issn_l | 1424-8220 |
| primary_location.source.is_core | True |
| primary_location.source.is_in_doaj | True |
| primary_location.source.display_name | Sensors |
| primary_location.source.host_organization | https://openalex.org/P4310310987 |
| primary_location.source.host_organization_name | Multidisciplinary Digital Publishing Institute |
| primary_location.source.host_organization_lineage | https://openalex.org/P4310310987 |
| primary_location.source.host_organization_lineage_names | Multidisciplinary Digital Publishing Institute |
| primary_location.license | cc-by |
| primary_location.pdf_url | https://www.mdpi.com/1424-8220/18/11/3615/pdf?version=1540450394 |
| primary_location.version | publishedVersion |
| primary_location.raw_type | journal-article |
| primary_location.license_id | https://openalex.org/licenses/cc-by |
| primary_location.is_accepted | True |
| primary_location.is_published | True |
| primary_location.raw_source_name | Sensors |
| primary_location.landing_page_url | https://doi.org/10.3390/s18113615 |
| publication_date | 2018-10-24 |
| publication_year | 2018 |
| referenced_works | https://openalex.org/W6679348305, https://openalex.org/W2072963278, https://openalex.org/W2809113403, https://openalex.org/W2790663123, https://openalex.org/W2102950464, https://openalex.org/W2132594929, https://openalex.org/W2786456277, https://openalex.org/W2604670533, https://openalex.org/W2295847425, https://openalex.org/W2611757533, https://openalex.org/W2155303087, https://openalex.org/W2956812649, https://openalex.org/W4247726752, https://openalex.org/W2100639514, https://openalex.org/W2070210896, https://openalex.org/W3015370673, https://openalex.org/W1988498871, https://openalex.org/W2129759371, https://openalex.org/W2131250925, https://openalex.org/W2342433269, https://openalex.org/W1986632072, https://openalex.org/W2894523710 |
| referenced_works_count | 22 |
| abstract_inverted_index.a | 121 |
| abstract_inverted_index.In | 82 |
| abstract_inverted_index.be | 79, 95 |
| abstract_inverted_index.in | 13, 40, 51, 72, 105, 125 |
| abstract_inverted_index.is | 33, 118 |
| abstract_inverted_index.it | 32, 93 |
| abstract_inverted_index.of | 4, 23, 62, 110, 153 |
| abstract_inverted_index.to | 35, 97 |
| abstract_inverted_index.we | 85 |
| abstract_inverted_index.The | 18, 43, 108, 145 |
| abstract_inverted_index.and | 21, 151 |
| abstract_inverted_index.are | 10, 27, 132 |
| abstract_inverted_index.can | 94 |
| abstract_inverted_index.for | 58, 102, 114 |
| abstract_inverted_index.has | 47 |
| abstract_inverted_index.our | 129 |
| abstract_inverted_index.the | 1, 14, 24, 37, 52, 74, 87, 99, 115, 135, 140, 149, 154 |
| abstract_inverted_index.With | 0 |
| abstract_inverted_index.been | 48 |
| abstract_inverted_index.data | 70 |
| abstract_inverted_index.grid | 6 |
| abstract_inverted_index.into | 120 |
| abstract_inverted_index.most | 65 |
| abstract_inverted_index.ones | 137 |
| abstract_inverted_index.path | 123 |
| abstract_inverted_index.such | 91 |
| abstract_inverted_index.that | 92 |
| abstract_inverted_index.this | 83 |
| abstract_inverted_index.used | 96 |
| abstract_inverted_index.with | 134, 139 |
| abstract_inverted_index.Thus, | 31 |
| abstract_inverted_index.delay | 39, 54, 101, 112 |
| abstract_inverted_index.graph | 126 |
| abstract_inverted_index.power | 16, 25, 63, 66, 103 |
| abstract_inverted_index.rapid | 2 |
| abstract_inverted_index.smart | 5, 106 |
| abstract_inverted_index.which | 73 |
| abstract_inverted_index.better | 59 |
| abstract_inverted_index.cannot | 78 |
| abstract_inverted_index.expand | 86 |
| abstract_inverted_index.grids. | 17, 107 |
| abstract_inverted_index.paper, | 84 |
| abstract_inverted_index.system | 117 |
| abstract_inverted_index.tasks. | 56 |
| abstract_inverted_index.theory | 46, 77, 90 |
| abstract_inverted_index.verify | 148 |
| abstract_inverted_index.widely | 49 |
| abstract_inverted_index.analyze | 98 |
| abstract_inverted_index.applied | 50 |
| abstract_inverted_index.further | 11 |
| abstract_inverted_index.maximum | 122 |
| abstract_inverted_index.measure | 36 |
| abstract_inverted_index.method. | 156 |
| abstract_inverted_index.network | 44, 75, 88, 141 |
| abstract_inverted_index.problem | 109, 124 |
| abstract_inverted_index.require | 68 |
| abstract_inverted_index.results | 131, 147 |
| abstract_inverted_index.systems | 9 |
| abstract_inverted_index.theory. | 127 |
| abstract_inverted_index.EstiNet. | 144 |
| abstract_inverted_index.Finally, | 128 |
| abstract_inverted_index.However, | 57 |
| abstract_inverted_index.applied. | 81 |
| abstract_inverted_index.calculus | 45, 76, 89 |
| abstract_inverted_index.compared | 133 |
| abstract_inverted_index.directly | 80 |
| abstract_inverted_index.existing | 15 |
| abstract_inverted_index.obtained | 138 |
| abstract_inverted_index.proposed | 155 |
| abstract_inverted_index.software | 143 |
| abstract_inverted_index.systems, | 64 |
| abstract_inverted_index.systems. | 42 |
| abstract_inverted_index.concerns. | 30 |
| abstract_inverted_index.converted | 119 |
| abstract_inverted_index.important | 34 |
| abstract_inverted_index.measuring | 55 |
| abstract_inverted_index.operation | 60 |
| abstract_inverted_index.real-time | 19 |
| abstract_inverted_index.receiving | 28 |
| abstract_inverted_index.capability | 20 |
| abstract_inverted_index.end-to-end | 38 |
| abstract_inverted_index.increasing | 29 |
| abstract_inverted_index.integrated | 12 |
| abstract_inverted_index.simulation | 142, 146 |
| abstract_inverted_index.calculation | 113 |
| abstract_inverted_index.development | 3 |
| abstract_inverted_index.feasibility | 150 |
| abstract_inverted_index.performance | 61 |
| abstract_inverted_index.reliability | 22 |
| abstract_inverted_index.synchronous | 69 |
| abstract_inverted_index.theoretical | 130 |
| abstract_inverted_index.applications | 26, 67, 104 |
| abstract_inverted_index.experimental | 136 |
| abstract_inverted_index.communication | 8, 41, 53, 100, 111 |
| abstract_inverted_index.effectiveness | 152 |
| abstract_inverted_index.technologies, | 7 |
| abstract_inverted_index.communication, | 71 |
| abstract_inverted_index.synchronization | 116 |
| cited_by_percentile_year.max | 98 |
| cited_by_percentile_year.min | 89 |
| corresponding_author_ids | https://openalex.org/A5100767396 |
| countries_distinct_count | 1 |
| institutions_distinct_count | 4 |
| corresponding_institution_ids | https://openalex.org/I99065089 |
| sustainable_development_goals[0].id | https://metadata.un.org/sdg/7 |
| sustainable_development_goals[0].score | 0.6399999856948853 |
| sustainable_development_goals[0].display_name | Affordable and clean energy |
| citation_normalized_percentile.value | 0.79569874 |
| citation_normalized_percentile.is_in_top_1_percent | False |
| citation_normalized_percentile.is_in_top_10_percent | False |