I-OPC: An intelligent optimal path computation system using critical path prediction and deep learning for a time-sensitive network Article Swipe
YOU?
·
· 2023
· Open Access
·
· DOI: https://doi.org/10.1016/j.aej.2023.10.025
Latency and energy are critical issues when working with time and power-constrained wireless sensor networks. To avoid wasting both time and energy, such systems require selecting optimal communication routes with minimum latency and energy. The energy and latency costs between sender and destination nodes are greatly affected by the occurrence of transmission holes (black hole and grey hole). Therefore, selecting the optimal path must consider the probability of transmission holes and investigate their impact on energy and latency costs. Based on these problems of silent failures, the current work, proposes i-OPC as an intelligent and effective system to address these problems by forecasting sources of such silent failures and resolving them before they occur. The proposed method uses a customized routing schedule and a multi-objective mathematical optimization approach to rank all candidate paths between the source and destination nodes. In addition, i-OPC implements a machine learning technique using deep learning to predict the energy and latency costs of the future location for mobile nodes (). Also, it determines if the future locations of mobile nodes can result in black holes. Experiments produces promising results in terms of delay, energy consumption, packet delivery rate and hole detection rate against existing methods.
Related Topics
- Type
- article
- Language
- en
- Landing Page
- https://doi.org/10.1016/j.aej.2023.10.025
- OA Status
- gold
- Cited By
- 5
- References
- 48
- Related Works
- 10
- OpenAlex ID
- https://openalex.org/W4388519703
Raw OpenAlex JSON
- OpenAlex ID
-
https://openalex.org/W4388519703Canonical identifier for this work in OpenAlex
- DOI
-
https://doi.org/10.1016/j.aej.2023.10.025Digital Object Identifier
- Title
-
I-OPC: An intelligent optimal path computation system using critical path prediction and deep learning for a time-sensitive networkWork title
- Type
-
articleOpenAlex work type
- Language
-
enPrimary language
- Publication year
-
2023Year of publication
- Publication date
-
2023-11-09Full publication date if available
- Authors
-
Safa’a S. Saleh, Iman Alansari, Mounira Kezadri Hamiaz, Waleed M. Ead, Rana A. Tarabishi, Mohamed Farouk, Hatem KhaterList of authors in order
- Landing page
-
https://doi.org/10.1016/j.aej.2023.10.025Publisher landing page
- Open access
-
YesWhether a free full text is available
- OA status
-
goldOpen access status per OpenAlex
- OA URL
-
https://doi.org/10.1016/j.aej.2023.10.025Direct OA link when available
- Concepts
-
Computer science, Latency (audio), Energy consumption, Wireless sensor network, Network packet, Schedule, Real-time computing, Efficient energy use, Data transmission, Distributed computing, Computer network, Engineering, Telecommunications, Electrical engineering, Operating systemTop concepts (fields/topics) attached by OpenAlex
- Cited by
-
5Total citation count in OpenAlex
- Citations by year (recent)
-
2025: 2, 2024: 2, 2023: 1Per-year citation counts (last 5 years)
- References (count)
-
48Number of works referenced by this work
- Related works (count)
-
10Other works algorithmically related by OpenAlex
Full payload
| id | https://openalex.org/W4388519703 |
|---|---|
| doi | https://doi.org/10.1016/j.aej.2023.10.025 |
| ids.doi | https://doi.org/10.1016/j.aej.2023.10.025 |
| ids.openalex | https://openalex.org/W4388519703 |
| fwci | 2.19776146 |
| type | article |
| title | I-OPC: An intelligent optimal path computation system using critical path prediction and deep learning for a time-sensitive network |
| biblio.issue | |
| biblio.volume | 84 |
| biblio.last_page | 152 |
| biblio.first_page | 138 |
| topics[0].id | https://openalex.org/T10080 |
| topics[0].field.id | https://openalex.org/fields/17 |
| topics[0].field.display_name | Computer Science |
| topics[0].score | 0.9997000098228455 |
| topics[0].domain.id | https://openalex.org/domains/3 |
| topics[0].domain.display_name | Physical Sciences |
| topics[0].subfield.id | https://openalex.org/subfields/1705 |
| topics[0].subfield.display_name | Computer Networks and Communications |
| topics[0].display_name | Energy Efficient Wireless Sensor Networks |
| topics[1].id | https://openalex.org/T10714 |
| topics[1].field.id | https://openalex.org/fields/17 |
| topics[1].field.display_name | Computer Science |
| topics[1].score | 0.9983000159263611 |
| topics[1].domain.id | https://openalex.org/domains/3 |
| topics[1].domain.display_name | Physical Sciences |
| topics[1].subfield.id | https://openalex.org/subfields/1705 |
| topics[1].subfield.display_name | Computer Networks and Communications |
| topics[1].display_name | Software-Defined Networks and 5G |
| topics[2].id | https://openalex.org/T10273 |
| topics[2].field.id | https://openalex.org/fields/17 |
| topics[2].field.display_name | Computer Science |
| topics[2].score | 0.9973999857902527 |
| topics[2].domain.id | https://openalex.org/domains/3 |
| topics[2].domain.display_name | Physical Sciences |
| topics[2].subfield.id | https://openalex.org/subfields/1705 |
| topics[2].subfield.display_name | Computer Networks and Communications |
| topics[2].display_name | IoT and Edge/Fog Computing |
| is_xpac | False |
| apc_list.value | 860 |
| apc_list.currency | USD |
| apc_list.value_usd | 860 |
| apc_paid.value | 860 |
| apc_paid.currency | USD |
| apc_paid.value_usd | 860 |
| concepts[0].id | https://openalex.org/C41008148 |
| concepts[0].level | 0 |
| concepts[0].score | 0.6959603428840637 |
| concepts[0].wikidata | https://www.wikidata.org/wiki/Q21198 |
| concepts[0].display_name | Computer science |
| concepts[1].id | https://openalex.org/C82876162 |
| concepts[1].level | 2 |
| concepts[1].score | 0.6684333682060242 |
| concepts[1].wikidata | https://www.wikidata.org/wiki/Q17096504 |
| concepts[1].display_name | Latency (audio) |
| concepts[2].id | https://openalex.org/C2780165032 |
| concepts[2].level | 2 |
| concepts[2].score | 0.6181098222732544 |
| concepts[2].wikidata | https://www.wikidata.org/wiki/Q16869822 |
| concepts[2].display_name | Energy consumption |
| concepts[3].id | https://openalex.org/C24590314 |
| concepts[3].level | 2 |
| concepts[3].score | 0.5840668082237244 |
| concepts[3].wikidata | https://www.wikidata.org/wiki/Q336038 |
| concepts[3].display_name | Wireless sensor network |
| concepts[4].id | https://openalex.org/C158379750 |
| concepts[4].level | 2 |
| concepts[4].score | 0.5312618613243103 |
| concepts[4].wikidata | https://www.wikidata.org/wiki/Q214111 |
| concepts[4].display_name | Network packet |
| concepts[5].id | https://openalex.org/C68387754 |
| concepts[5].level | 2 |
| concepts[5].score | 0.5305208563804626 |
| concepts[5].wikidata | https://www.wikidata.org/wiki/Q7271585 |
| concepts[5].display_name | Schedule |
| concepts[6].id | https://openalex.org/C79403827 |
| concepts[6].level | 1 |
| concepts[6].score | 0.5298685431480408 |
| concepts[6].wikidata | https://www.wikidata.org/wiki/Q3988 |
| concepts[6].display_name | Real-time computing |
| concepts[7].id | https://openalex.org/C2742236 |
| concepts[7].level | 2 |
| concepts[7].score | 0.4363253116607666 |
| concepts[7].wikidata | https://www.wikidata.org/wiki/Q924713 |
| concepts[7].display_name | Efficient energy use |
| concepts[8].id | https://openalex.org/C557945733 |
| concepts[8].level | 2 |
| concepts[8].score | 0.42197373509407043 |
| concepts[8].wikidata | https://www.wikidata.org/wiki/Q389772 |
| concepts[8].display_name | Data transmission |
| concepts[9].id | https://openalex.org/C120314980 |
| concepts[9].level | 1 |
| concepts[9].score | 0.36694926023483276 |
| concepts[9].wikidata | https://www.wikidata.org/wiki/Q180634 |
| concepts[9].display_name | Distributed computing |
| concepts[10].id | https://openalex.org/C31258907 |
| concepts[10].level | 1 |
| concepts[10].score | 0.3210597038269043 |
| concepts[10].wikidata | https://www.wikidata.org/wiki/Q1301371 |
| concepts[10].display_name | Computer network |
| concepts[11].id | https://openalex.org/C127413603 |
| concepts[11].level | 0 |
| concepts[11].score | 0.18937113881111145 |
| concepts[11].wikidata | https://www.wikidata.org/wiki/Q11023 |
| concepts[11].display_name | Engineering |
| concepts[12].id | https://openalex.org/C76155785 |
| concepts[12].level | 1 |
| concepts[12].score | 0.09650826454162598 |
| concepts[12].wikidata | https://www.wikidata.org/wiki/Q418 |
| concepts[12].display_name | Telecommunications |
| concepts[13].id | https://openalex.org/C119599485 |
| concepts[13].level | 1 |
| concepts[13].score | 0.0 |
| concepts[13].wikidata | https://www.wikidata.org/wiki/Q43035 |
| concepts[13].display_name | Electrical engineering |
| concepts[14].id | https://openalex.org/C111919701 |
| concepts[14].level | 1 |
| concepts[14].score | 0.0 |
| concepts[14].wikidata | https://www.wikidata.org/wiki/Q9135 |
| concepts[14].display_name | Operating system |
| keywords[0].id | https://openalex.org/keywords/computer-science |
| keywords[0].score | 0.6959603428840637 |
| keywords[0].display_name | Computer science |
| keywords[1].id | https://openalex.org/keywords/latency |
| keywords[1].score | 0.6684333682060242 |
| keywords[1].display_name | Latency (audio) |
| keywords[2].id | https://openalex.org/keywords/energy-consumption |
| keywords[2].score | 0.6181098222732544 |
| keywords[2].display_name | Energy consumption |
| keywords[3].id | https://openalex.org/keywords/wireless-sensor-network |
| keywords[3].score | 0.5840668082237244 |
| keywords[3].display_name | Wireless sensor network |
| keywords[4].id | https://openalex.org/keywords/network-packet |
| keywords[4].score | 0.5312618613243103 |
| keywords[4].display_name | Network packet |
| keywords[5].id | https://openalex.org/keywords/schedule |
| keywords[5].score | 0.5305208563804626 |
| keywords[5].display_name | Schedule |
| keywords[6].id | https://openalex.org/keywords/real-time-computing |
| keywords[6].score | 0.5298685431480408 |
| keywords[6].display_name | Real-time computing |
| keywords[7].id | https://openalex.org/keywords/efficient-energy-use |
| keywords[7].score | 0.4363253116607666 |
| keywords[7].display_name | Efficient energy use |
| keywords[8].id | https://openalex.org/keywords/data-transmission |
| keywords[8].score | 0.42197373509407043 |
| keywords[8].display_name | Data transmission |
| keywords[9].id | https://openalex.org/keywords/distributed-computing |
| keywords[9].score | 0.36694926023483276 |
| keywords[9].display_name | Distributed computing |
| keywords[10].id | https://openalex.org/keywords/computer-network |
| keywords[10].score | 0.3210597038269043 |
| keywords[10].display_name | Computer network |
| keywords[11].id | https://openalex.org/keywords/engineering |
| keywords[11].score | 0.18937113881111145 |
| keywords[11].display_name | Engineering |
| keywords[12].id | https://openalex.org/keywords/telecommunications |
| keywords[12].score | 0.09650826454162598 |
| keywords[12].display_name | Telecommunications |
| language | en |
| locations[0].id | doi:10.1016/j.aej.2023.10.025 |
| locations[0].is_oa | True |
| locations[0].source.id | https://openalex.org/S2764413287 |
| locations[0].source.issn | 1110-0168, 2090-2670 |
| locations[0].source.type | journal |
| locations[0].source.is_oa | True |
| locations[0].source.issn_l | 1110-0168 |
| locations[0].source.is_core | True |
| locations[0].source.is_in_doaj | True |
| locations[0].source.display_name | Alexandria Engineering Journal |
| locations[0].source.host_organization | https://openalex.org/P4310320990 |
| locations[0].source.host_organization_name | Elsevier BV |
| locations[0].source.host_organization_lineage | https://openalex.org/P4310320990 |
| locations[0].source.host_organization_lineage_names | Elsevier BV |
| locations[0].license | cc-by-nc-nd |
| locations[0].pdf_url | |
| locations[0].version | publishedVersion |
| locations[0].raw_type | journal-article |
| locations[0].license_id | https://openalex.org/licenses/cc-by-nc-nd |
| locations[0].is_accepted | True |
| locations[0].is_published | True |
| locations[0].raw_source_name | Alexandria Engineering Journal |
| locations[0].landing_page_url | https://doi.org/10.1016/j.aej.2023.10.025 |
| locations[1].id | pmh:oai:doaj.org/article:3f7d9acdfc83423ab1e046f3a30be1a2 |
| locations[1].is_oa | False |
| locations[1].source.id | https://openalex.org/S4306401280 |
| locations[1].source.issn | |
| locations[1].source.type | repository |
| locations[1].source.is_oa | False |
| locations[1].source.issn_l | |
| locations[1].source.is_core | False |
| locations[1].source.is_in_doaj | False |
| locations[1].source.display_name | DOAJ (DOAJ: Directory of Open Access Journals) |
| locations[1].source.host_organization | |
| locations[1].source.host_organization_name | |
| locations[1].license | |
| locations[1].pdf_url | |
| locations[1].version | submittedVersion |
| locations[1].raw_type | article |
| locations[1].license_id | |
| locations[1].is_accepted | False |
| locations[1].is_published | False |
| locations[1].raw_source_name | Alexandria Engineering Journal, Vol 84, Iss , Pp 138-152 (2023) |
| locations[1].landing_page_url | https://doaj.org/article/3f7d9acdfc83423ab1e046f3a30be1a2 |
| indexed_in | crossref, doaj |
| authorships[0].author.id | https://openalex.org/A5078114215 |
| authorships[0].author.orcid | https://orcid.org/0000-0003-0657-979X |
| authorships[0].author.display_name | Safa’a S. Saleh |
| authorships[0].countries | EG |
| authorships[0].affiliations[0].institution_ids | https://openalex.org/I4210136155 |
| authorships[0].affiliations[0].raw_affiliation_string | Information Systems Department, Egyptian Institute of Alexandria Academy for Management and Accounting, Alex, Egypt |
| authorships[0].institutions[0].id | https://openalex.org/I4210136155 |
| authorships[0].institutions[0].ror | https://ror.org/04ebnqc56 |
| authorships[0].institutions[0].type | education |
| authorships[0].institutions[0].lineage | https://openalex.org/I4210136155 |
| authorships[0].institutions[0].country_code | EG |
| authorships[0].institutions[0].display_name | Egyptian Institute of Alexandria Academy for Administration & Accounting |
| authorships[0].author_position | first |
| authorships[0].raw_author_name | Safa'a S. Saleh |
| authorships[0].is_corresponding | True |
| authorships[0].raw_affiliation_strings | Information Systems Department, Egyptian Institute of Alexandria Academy for Management and Accounting, Alex, Egypt |
| authorships[1].author.id | https://openalex.org/A5083706168 |
| authorships[1].author.orcid | https://orcid.org/0000-0003-1099-9228 |
| authorships[1].author.display_name | Iman Alansari |
| authorships[1].countries | SA |
| authorships[1].affiliations[0].institution_ids | https://openalex.org/I23075662 |
| authorships[1].affiliations[0].raw_affiliation_string | Computer Science Department, College of Computer Science and Engineering, Taibah University, Madinah, Saudi Arabia |
| authorships[1].institutions[0].id | https://openalex.org/I23075662 |
| authorships[1].institutions[0].ror | https://ror.org/01xv1nn60 |
| authorships[1].institutions[0].type | education |
| authorships[1].institutions[0].lineage | https://openalex.org/I23075662 |
| authorships[1].institutions[0].country_code | SA |
| authorships[1].institutions[0].display_name | Taibah University |
| authorships[1].author_position | middle |
| authorships[1].raw_author_name | Iman Sadek Alansari |
| authorships[1].is_corresponding | False |
| authorships[1].raw_affiliation_strings | Computer Science Department, College of Computer Science and Engineering, Taibah University, Madinah, Saudi Arabia |
| authorships[2].author.id | https://openalex.org/A5085820290 |
| authorships[2].author.orcid | https://orcid.org/0009-0007-5636-7062 |
| authorships[2].author.display_name | Mounira Kezadri Hamiaz |
| authorships[2].countries | SA |
| authorships[2].affiliations[0].institution_ids | https://openalex.org/I23075662 |
| authorships[2].affiliations[0].raw_affiliation_string | Applied College, Taibah University, Madinah, Saudi Arabia |
| authorships[2].institutions[0].id | https://openalex.org/I23075662 |
| authorships[2].institutions[0].ror | https://ror.org/01xv1nn60 |
| authorships[2].institutions[0].type | education |
| authorships[2].institutions[0].lineage | https://openalex.org/I23075662 |
| authorships[2].institutions[0].country_code | SA |
| authorships[2].institutions[0].display_name | Taibah University |
| authorships[2].author_position | middle |
| authorships[2].raw_author_name | Mounira Kezadri Hamiaz |
| authorships[2].is_corresponding | False |
| authorships[2].raw_affiliation_strings | Applied College, Taibah University, Madinah, Saudi Arabia |
| authorships[3].author.id | https://openalex.org/A5001127548 |
| authorships[3].author.orcid | https://orcid.org/0000-0003-2969-2269 |
| authorships[3].author.display_name | Waleed M. Ead |
| authorships[3].countries | EG |
| authorships[3].affiliations[0].institution_ids | https://openalex.org/I113643904 |
| authorships[3].affiliations[0].raw_affiliation_string | Faculty of Computers and Artificial Intelligence, Beni-Suef University, Egypt |
| authorships[3].affiliations[1].institution_ids | https://openalex.org/I32619867 |
| authorships[3].affiliations[1].raw_affiliation_string | Egypt-Japan University of Science and Technology (E-JUST), Egypt |
| authorships[3].institutions[0].id | https://openalex.org/I113643904 |
| authorships[3].institutions[0].ror | https://ror.org/05pn4yv70 |
| authorships[3].institutions[0].type | education |
| authorships[3].institutions[0].lineage | https://openalex.org/I113643904 |
| authorships[3].institutions[0].country_code | EG |
| authorships[3].institutions[0].display_name | Beni-Suef University |
| authorships[3].institutions[1].id | https://openalex.org/I32619867 |
| authorships[3].institutions[1].ror | https://ror.org/02x66tk73 |
| authorships[3].institutions[1].type | education |
| authorships[3].institutions[1].lineage | https://openalex.org/I32619867 |
| authorships[3].institutions[1].country_code | EG |
| authorships[3].institutions[1].display_name | Egypt-Japan University of Science and Technology |
| authorships[3].author_position | middle |
| authorships[3].raw_author_name | Waleed Ead |
| authorships[3].is_corresponding | False |
| authorships[3].raw_affiliation_strings | Egypt-Japan University of Science and Technology (E-JUST), Egypt, Faculty of Computers and Artificial Intelligence, Beni-Suef University, Egypt |
| authorships[4].author.id | https://openalex.org/A5053820629 |
| authorships[4].author.orcid | https://orcid.org/0000-0003-1183-6738 |
| authorships[4].author.display_name | Rana A. Tarabishi |
| authorships[4].countries | SA |
| authorships[4].affiliations[0].institution_ids | https://openalex.org/I23075662 |
| authorships[4].affiliations[0].raw_affiliation_string | Computer Science Department, College of Computer Science and Engineering, Taibah University, Madinah, Saudi Arabia |
| authorships[4].institutions[0].id | https://openalex.org/I23075662 |
| authorships[4].institutions[0].ror | https://ror.org/01xv1nn60 |
| authorships[4].institutions[0].type | education |
| authorships[4].institutions[0].lineage | https://openalex.org/I23075662 |
| authorships[4].institutions[0].country_code | SA |
| authorships[4].institutions[0].display_name | Taibah University |
| authorships[4].author_position | middle |
| authorships[4].raw_author_name | Rana A. Tarabishi |
| authorships[4].is_corresponding | False |
| authorships[4].raw_affiliation_strings | Computer Science Department, College of Computer Science and Engineering, Taibah University, Madinah, Saudi Arabia |
| authorships[5].author.id | https://openalex.org/A5101702598 |
| authorships[5].author.orcid | |
| authorships[5].author.display_name | Mohamed Farouk |
| authorships[5].countries | EG |
| authorships[5].affiliations[0].institution_ids | https://openalex.org/I59272784 |
| authorships[5].affiliations[0].raw_affiliation_string | Department of Computer Science, College of Computing & Information Technology, Arab Academy for Science, Technology, and Maritime Transport, Alexandria, Egypt |
| authorships[5].institutions[0].id | https://openalex.org/I59272784 |
| authorships[5].institutions[0].ror | https://ror.org/0004vyj87 |
| authorships[5].institutions[0].type | education |
| authorships[5].institutions[0].lineage | https://openalex.org/I59272784 |
| authorships[5].institutions[0].country_code | EG |
| authorships[5].institutions[0].display_name | Arab Academy for Science, Technology, and Maritime Transport |
| authorships[5].author_position | middle |
| authorships[5].raw_author_name | Mohamed Farouk |
| authorships[5].is_corresponding | False |
| authorships[5].raw_affiliation_strings | Department of Computer Science, College of Computing & Information Technology, Arab Academy for Science, Technology, and Maritime Transport, Alexandria, Egypt |
| authorships[6].author.id | https://openalex.org/A5044329951 |
| authorships[6].author.orcid | https://orcid.org/0000-0003-3453-5145 |
| authorships[6].author.display_name | Hatem Khater |
| authorships[6].countries | EG |
| authorships[6].affiliations[0].institution_ids | https://openalex.org/I126427551 |
| authorships[6].affiliations[0].raw_affiliation_string | Department of Mechatronics Engineering, Faculty of Engineering, Horus University, Egypt New Damietta 34518, Egypt |
| authorships[6].institutions[0].id | https://openalex.org/I126427551 |
| authorships[6].institutions[0].ror | https://ror.org/035h3r191 |
| authorships[6].institutions[0].type | education |
| authorships[6].institutions[0].lineage | https://openalex.org/I126427551 |
| authorships[6].institutions[0].country_code | EG |
| authorships[6].institutions[0].display_name | Damietta University |
| authorships[6].author_position | last |
| authorships[6].raw_author_name | Hatem A. Khater |
| authorships[6].is_corresponding | False |
| authorships[6].raw_affiliation_strings | Department of Mechatronics Engineering, Faculty of Engineering, Horus University, Egypt New Damietta 34518, Egypt |
| has_content.pdf | False |
| has_content.grobid_xml | False |
| is_paratext | False |
| open_access.is_oa | True |
| open_access.oa_url | https://doi.org/10.1016/j.aej.2023.10.025 |
| open_access.oa_status | gold |
| open_access.any_repository_has_fulltext | False |
| created_date | 2025-10-10T00:00:00 |
| display_name | I-OPC: An intelligent optimal path computation system using critical path prediction and deep learning for a time-sensitive network |
| has_fulltext | False |
| is_retracted | False |
| updated_date | 2025-11-06T03:46:38.306776 |
| primary_topic.id | https://openalex.org/T10080 |
| primary_topic.field.id | https://openalex.org/fields/17 |
| primary_topic.field.display_name | Computer Science |
| primary_topic.score | 0.9997000098228455 |
| primary_topic.domain.id | https://openalex.org/domains/3 |
| primary_topic.domain.display_name | Physical Sciences |
| primary_topic.subfield.id | https://openalex.org/subfields/1705 |
| primary_topic.subfield.display_name | Computer Networks and Communications |
| primary_topic.display_name | Energy Efficient Wireless Sensor Networks |
| related_works | https://openalex.org/W2195904091, https://openalex.org/W2307385607, https://openalex.org/W4249307902, https://openalex.org/W2381415338, https://openalex.org/W2365404242, https://openalex.org/W2049400599, https://openalex.org/W2049261842, https://openalex.org/W2966346273, https://openalex.org/W2479866044, https://openalex.org/W4282972749 |
| cited_by_count | 5 |
| counts_by_year[0].year | 2025 |
| counts_by_year[0].cited_by_count | 2 |
| counts_by_year[1].year | 2024 |
| counts_by_year[1].cited_by_count | 2 |
| counts_by_year[2].year | 2023 |
| counts_by_year[2].cited_by_count | 1 |
| locations_count | 2 |
| best_oa_location.id | doi:10.1016/j.aej.2023.10.025 |
| best_oa_location.is_oa | True |
| best_oa_location.source.id | https://openalex.org/S2764413287 |
| best_oa_location.source.issn | 1110-0168, 2090-2670 |
| best_oa_location.source.type | journal |
| best_oa_location.source.is_oa | True |
| best_oa_location.source.issn_l | 1110-0168 |
| best_oa_location.source.is_core | True |
| best_oa_location.source.is_in_doaj | True |
| best_oa_location.source.display_name | Alexandria Engineering Journal |
| best_oa_location.source.host_organization | https://openalex.org/P4310320990 |
| best_oa_location.source.host_organization_name | Elsevier BV |
| best_oa_location.source.host_organization_lineage | https://openalex.org/P4310320990 |
| best_oa_location.source.host_organization_lineage_names | Elsevier BV |
| best_oa_location.license | cc-by-nc-nd |
| best_oa_location.pdf_url | |
| best_oa_location.version | publishedVersion |
| best_oa_location.raw_type | journal-article |
| best_oa_location.license_id | https://openalex.org/licenses/cc-by-nc-nd |
| best_oa_location.is_accepted | True |
| best_oa_location.is_published | True |
| best_oa_location.raw_source_name | Alexandria Engineering Journal |
| best_oa_location.landing_page_url | https://doi.org/10.1016/j.aej.2023.10.025 |
| primary_location.id | doi:10.1016/j.aej.2023.10.025 |
| primary_location.is_oa | True |
| primary_location.source.id | https://openalex.org/S2764413287 |
| primary_location.source.issn | 1110-0168, 2090-2670 |
| primary_location.source.type | journal |
| primary_location.source.is_oa | True |
| primary_location.source.issn_l | 1110-0168 |
| primary_location.source.is_core | True |
| primary_location.source.is_in_doaj | True |
| primary_location.source.display_name | Alexandria Engineering Journal |
| primary_location.source.host_organization | https://openalex.org/P4310320990 |
| primary_location.source.host_organization_name | Elsevier BV |
| primary_location.source.host_organization_lineage | https://openalex.org/P4310320990 |
| primary_location.source.host_organization_lineage_names | Elsevier BV |
| primary_location.license | cc-by-nc-nd |
| primary_location.pdf_url | |
| primary_location.version | publishedVersion |
| primary_location.raw_type | journal-article |
| primary_location.license_id | https://openalex.org/licenses/cc-by-nc-nd |
| primary_location.is_accepted | True |
| primary_location.is_published | True |
| primary_location.raw_source_name | Alexandria Engineering Journal |
| primary_location.landing_page_url | https://doi.org/10.1016/j.aej.2023.10.025 |
| publication_date | 2023-11-09 |
| publication_year | 2023 |
| referenced_works | https://openalex.org/W2873901939, https://openalex.org/W2118327872, https://openalex.org/W2222746796, https://openalex.org/W2977793304, https://openalex.org/W2045801512, https://openalex.org/W3211282492, https://openalex.org/W2912236644, https://openalex.org/W2791274860, https://openalex.org/W2981402494, https://openalex.org/W4376626696, https://openalex.org/W2889327404, https://openalex.org/W3136395494, https://openalex.org/W4296251557, https://openalex.org/W4361278402, https://openalex.org/W3013865443, https://openalex.org/W3090069470, https://openalex.org/W3208897665, https://openalex.org/W4320169613, https://openalex.org/W1974525597, https://openalex.org/W4310607892, https://openalex.org/W4220917170, https://openalex.org/W2885399344, https://openalex.org/W4293479213, https://openalex.org/W3198867820, https://openalex.org/W2999722000, https://openalex.org/W2924869419, https://openalex.org/W3091909295, https://openalex.org/W3124001327, https://openalex.org/W3192867717, https://openalex.org/W6769869306, https://openalex.org/W3048996565, https://openalex.org/W2147118406, https://openalex.org/W3092364355, https://openalex.org/W3194117616, https://openalex.org/W2084915558, https://openalex.org/W2512895271, https://openalex.org/W4226439939, https://openalex.org/W3009642498, https://openalex.org/W2891418168, https://openalex.org/W3029682190, https://openalex.org/W3158849581, https://openalex.org/W3129158970, https://openalex.org/W3087022669, https://openalex.org/W2538073488, https://openalex.org/W6749703802, https://openalex.org/W4362677981, https://openalex.org/W2794684808, https://openalex.org/W2984597694 |
| referenced_works_count | 48 |
| abstract_inverted_index.a | 118, 123, 143 |
| abstract_inverted_index.In | 139 |
| abstract_inverted_index.To | 15 |
| abstract_inverted_index.an | 92 |
| abstract_inverted_index.as | 91 |
| abstract_inverted_index.by | 47, 101 |
| abstract_inverted_index.if | 168 |
| abstract_inverted_index.in | 177, 184 |
| abstract_inverted_index.it | 166 |
| abstract_inverted_index.of | 50, 67, 83, 104, 157, 172, 186 |
| abstract_inverted_index.on | 74, 80 |
| abstract_inverted_index.to | 97, 128, 150 |
| abstract_inverted_index.(). | 164 |
| abstract_inverted_index.The | 34, 114 |
| abstract_inverted_index.all | 130 |
| abstract_inverted_index.and | 1, 10, 20, 32, 36, 41, 55, 70, 76, 94, 108, 122, 136, 154, 193 |
| abstract_inverted_index.are | 3, 44 |
| abstract_inverted_index.can | 175 |
| abstract_inverted_index.for | 161 |
| abstract_inverted_index.the | 48, 60, 65, 86, 134, 152, 158, 169 |
| abstract_inverted_index.both | 18 |
| abstract_inverted_index.deep | 148 |
| abstract_inverted_index.grey | 56 |
| abstract_inverted_index.hole | 54, 194 |
| abstract_inverted_index.must | 63 |
| abstract_inverted_index.path | 62 |
| abstract_inverted_index.rank | 129 |
| abstract_inverted_index.rate | 192, 196 |
| abstract_inverted_index.such | 22, 105 |
| abstract_inverted_index.them | 110 |
| abstract_inverted_index.they | 112 |
| abstract_inverted_index.time | 9, 19 |
| abstract_inverted_index.uses | 117 |
| abstract_inverted_index.when | 6 |
| abstract_inverted_index.with | 8, 29 |
| abstract_inverted_index.Also, | 165 |
| abstract_inverted_index.Based | 79 |
| abstract_inverted_index.avoid | 16 |
| abstract_inverted_index.black | 178 |
| abstract_inverted_index.costs | 38, 156 |
| abstract_inverted_index.holes | 52, 69 |
| abstract_inverted_index.i-OPC | 90, 141 |
| abstract_inverted_index.nodes | 43, 163, 174 |
| abstract_inverted_index.paths | 132 |
| abstract_inverted_index.terms | 185 |
| abstract_inverted_index.their | 72 |
| abstract_inverted_index.these | 81, 99 |
| abstract_inverted_index.using | 147 |
| abstract_inverted_index.work, | 88 |
| abstract_inverted_index.(black | 53 |
| abstract_inverted_index.before | 111 |
| abstract_inverted_index.costs. | 78 |
| abstract_inverted_index.delay, | 187 |
| abstract_inverted_index.energy | 2, 35, 75, 153, 188 |
| abstract_inverted_index.future | 159, 170 |
| abstract_inverted_index.hole). | 57 |
| abstract_inverted_index.holes. | 179 |
| abstract_inverted_index.impact | 73 |
| abstract_inverted_index.issues | 5 |
| abstract_inverted_index.method | 116 |
| abstract_inverted_index.mobile | 162, 173 |
| abstract_inverted_index.nodes. | 138 |
| abstract_inverted_index.occur. | 113 |
| abstract_inverted_index.packet | 190 |
| abstract_inverted_index.result | 176 |
| abstract_inverted_index.routes | 28 |
| abstract_inverted_index.sender | 40 |
| abstract_inverted_index.sensor | 13 |
| abstract_inverted_index.silent | 84, 106 |
| abstract_inverted_index.source | 135 |
| abstract_inverted_index.system | 96 |
| abstract_inverted_index.Latency | 0 |
| abstract_inverted_index.address | 98 |
| abstract_inverted_index.against | 197 |
| abstract_inverted_index.between | 39, 133 |
| abstract_inverted_index.current | 87 |
| abstract_inverted_index.energy, | 21 |
| abstract_inverted_index.energy. | 33 |
| abstract_inverted_index.greatly | 45 |
| abstract_inverted_index.latency | 31, 37, 77, 155 |
| abstract_inverted_index.machine | 144 |
| abstract_inverted_index.minimum | 30 |
| abstract_inverted_index.optimal | 26, 61 |
| abstract_inverted_index.predict | 151 |
| abstract_inverted_index.require | 24 |
| abstract_inverted_index.results | 183 |
| abstract_inverted_index.routing | 120 |
| abstract_inverted_index.sources | 103 |
| abstract_inverted_index.systems | 23 |
| abstract_inverted_index.wasting | 17 |
| abstract_inverted_index.working | 7 |
| abstract_inverted_index.affected | 46 |
| abstract_inverted_index.approach | 127 |
| abstract_inverted_index.consider | 64 |
| abstract_inverted_index.critical | 4 |
| abstract_inverted_index.delivery | 191 |
| abstract_inverted_index.existing | 198 |
| abstract_inverted_index.failures | 107 |
| abstract_inverted_index.learning | 145, 149 |
| abstract_inverted_index.location | 160 |
| abstract_inverted_index.methods. | 199 |
| abstract_inverted_index.problems | 82, 100 |
| abstract_inverted_index.produces | 181 |
| abstract_inverted_index.proposed | 115 |
| abstract_inverted_index.proposes | 89 |
| abstract_inverted_index.schedule | 121 |
| abstract_inverted_index.wireless | 12 |
| abstract_inverted_index.addition, | 140 |
| abstract_inverted_index.candidate | 131 |
| abstract_inverted_index.detection | 195 |
| abstract_inverted_index.effective | 95 |
| abstract_inverted_index.failures, | 85 |
| abstract_inverted_index.locations | 171 |
| abstract_inverted_index.networks. | 14 |
| abstract_inverted_index.promising | 182 |
| abstract_inverted_index.resolving | 109 |
| abstract_inverted_index.selecting | 25, 59 |
| abstract_inverted_index.technique | 146 |
| abstract_inverted_index.Therefore, | 58 |
| abstract_inverted_index.customized | 119 |
| abstract_inverted_index.determines | 167 |
| abstract_inverted_index.implements | 142 |
| abstract_inverted_index.occurrence | 49 |
| abstract_inverted_index.Experiments | 180 |
| abstract_inverted_index.destination | 42, 137 |
| abstract_inverted_index.forecasting | 102 |
| abstract_inverted_index.intelligent | 93 |
| abstract_inverted_index.investigate | 71 |
| abstract_inverted_index.probability | 66 |
| abstract_inverted_index.consumption, | 189 |
| abstract_inverted_index.mathematical | 125 |
| abstract_inverted_index.optimization | 126 |
| abstract_inverted_index.transmission | 51, 68 |
| abstract_inverted_index.communication | 27 |
| abstract_inverted_index.multi-objective | 124 |
| abstract_inverted_index.power-constrained | 11 |
| cited_by_percentile_year.max | 97 |
| cited_by_percentile_year.min | 89 |
| corresponding_author_ids | https://openalex.org/A5078114215 |
| countries_distinct_count | 2 |
| institutions_distinct_count | 7 |
| corresponding_institution_ids | https://openalex.org/I4210136155 |
| sustainable_development_goals[0].id | https://metadata.un.org/sdg/7 |
| sustainable_development_goals[0].score | 0.9100000262260437 |
| sustainable_development_goals[0].display_name | Affordable and clean energy |
| citation_normalized_percentile.value | 0.80439614 |
| citation_normalized_percentile.is_in_top_1_percent | False |
| citation_normalized_percentile.is_in_top_10_percent | False |