Issues and Challenges of Building Information Modelling (BIM) Implementation in Facilities Management Article Swipe
YOU?
·
· 2025
· Open Access
·
· DOI: https://doi.org/10.24191/bej.v21isi.2420
Building Information Modelling (BIM) is one of the industry's emerging construction technologies. However, BIM adoption for Facilities Management (FM) has not yet been acknowledged. Traditional processes continue to drive FM in Malaysia, signalling the country's economic development and competitiveness. The likely cause is a lack of comprehension of information exchange on the BIM platform throughout the life cycle of the project. Consequently, the aim of this research is to explore and analyse the challenges and strategies associated with the implementation of BIM in FM, with the goal of providing actionable insights to enhance the adoption and effectiveness of BIM in the FM sector. The objectives of the research are to investigate the issues and challenges of BIM implementation in FM and to study the strategies for implementing BIM in FM. This research is using a quantitative method, by online questionnaire survey and SPSS software, to analyses the collected data. Non-probability sampling was applied as the method of sampling. 57 questionnaires were distributed to FM corporate companies in Malaysia based on the MAFM website, but only 19 responses with a 33% response rate were received. The findings of this study revealed a variety of issues and challenges with BIM implementation in Malaysian FM. One of the issues with BIM implementation in FM is the lack of integration between BIM and FM. However, the incompatibility of building automation systems and other FM technologies with BIM typically causes interoperability issues. As a result, government support for promoting BIM in the construction industry, as well as BIM education and training, is critical for increasing BIM adaptation in AEC organisations.
Related Topics
- Type
- article
- Language
- en
- Landing Page
- https://doi.org/10.24191/bej.v21isi.2420
- https://journal.uitm.edu.my/ojs/index.php/BEJ/article/download/2420/3315
- OA Status
- hybrid
- Cited By
- 1
- Related Works
- 10
- OpenAlex ID
- https://openalex.org/W4410608822
Raw OpenAlex JSON
- OpenAlex ID
-
https://openalex.org/W4410608822Canonical identifier for this work in OpenAlex
- DOI
-
https://doi.org/10.24191/bej.v21isi.2420Digital Object Identifier
- Title
-
Issues and Challenges of Building Information Modelling (BIM) Implementation in Facilities ManagementWork title
- Type
-
articleOpenAlex work type
- Language
-
enPrimary language
- Publication year
-
2025Year of publication
- Publication date
-
2025-05-01Full publication date if available
- Authors
-
Nagwa A. Sabri, Siti Nor Azniza Ahmad Sekak, Yusmady Md JunusList of authors in order
- Landing page
-
https://doi.org/10.24191/bej.v21isi.2420Publisher landing page
- PDF URL
-
https://journal.uitm.edu.my/ojs/index.php/BEJ/article/download/2420/3315Direct link to full text PDF
- Open access
-
YesWhether a free full text is available
- OA status
-
hybridOpen access status per OpenAlex
- OA URL
-
https://journal.uitm.edu.my/ojs/index.php/BEJ/article/download/2420/3315Direct OA link when available
- Concepts
-
Building information modeling, Facility management, Process management, Construction engineering, Engineering management, Information management, Knowledge management, Business, Systems engineering, Architectural engineering, Computer science, Engineering, Operations management, Scheduling (production processes), MarketingTop concepts (fields/topics) attached by OpenAlex
- Cited by
-
1Total citation count in OpenAlex
- Citations by year (recent)
-
2025: 1Per-year citation counts (last 5 years)
- Related works (count)
-
10Other works algorithmically related by OpenAlex
Full payload
| id | https://openalex.org/W4410608822 |
|---|---|
| doi | https://doi.org/10.24191/bej.v21isi.2420 |
| ids.doi | https://doi.org/10.24191/bej.v21isi.2420 |
| ids.openalex | https://openalex.org/W4410608822 |
| fwci | 2.70577588 |
| type | article |
| title | Issues and Challenges of Building Information Modelling (BIM) Implementation in Facilities Management |
| biblio.issue | SI |
| biblio.volume | 21 |
| biblio.last_page | |
| biblio.first_page | |
| topics[0].id | https://openalex.org/T11006 |
| topics[0].field.id | https://openalex.org/fields/22 |
| topics[0].field.display_name | Engineering |
| topics[0].score | 0.9898999929428101 |
| topics[0].domain.id | https://openalex.org/domains/3 |
| topics[0].domain.display_name | Physical Sciences |
| topics[0].subfield.id | https://openalex.org/subfields/2215 |
| topics[0].subfield.display_name | Building and Construction |
| topics[0].display_name | BIM and Construction Integration |
| is_xpac | False |
| apc_list | |
| apc_paid | |
| concepts[0].id | https://openalex.org/C66862320 |
| concepts[0].level | 3 |
| concepts[0].score | 0.8074862957000732 |
| concepts[0].wikidata | https://www.wikidata.org/wiki/Q842017 |
| concepts[0].display_name | Building information modeling |
| concepts[1].id | https://openalex.org/C117009084 |
| concepts[1].level | 2 |
| concepts[1].score | 0.5716736316680908 |
| concepts[1].wikidata | https://www.wikidata.org/wiki/Q837060 |
| concepts[1].display_name | Facility management |
| concepts[2].id | https://openalex.org/C195094911 |
| concepts[2].level | 1 |
| concepts[2].score | 0.4961720407009125 |
| concepts[2].wikidata | https://www.wikidata.org/wiki/Q14167904 |
| concepts[2].display_name | Process management |
| concepts[3].id | https://openalex.org/C107053488 |
| concepts[3].level | 1 |
| concepts[3].score | 0.4899827539920807 |
| concepts[3].wikidata | https://www.wikidata.org/wiki/Q2674423 |
| concepts[3].display_name | Construction engineering |
| concepts[4].id | https://openalex.org/C110354214 |
| concepts[4].level | 1 |
| concepts[4].score | 0.46152013540267944 |
| concepts[4].wikidata | https://www.wikidata.org/wiki/Q6314146 |
| concepts[4].display_name | Engineering management |
| concepts[5].id | https://openalex.org/C128487930 |
| concepts[5].level | 2 |
| concepts[5].score | 0.45222052931785583 |
| concepts[5].wikidata | https://www.wikidata.org/wiki/Q579488 |
| concepts[5].display_name | Information management |
| concepts[6].id | https://openalex.org/C56739046 |
| concepts[6].level | 1 |
| concepts[6].score | 0.4071298837661743 |
| concepts[6].wikidata | https://www.wikidata.org/wiki/Q192060 |
| concepts[6].display_name | Knowledge management |
| concepts[7].id | https://openalex.org/C144133560 |
| concepts[7].level | 0 |
| concepts[7].score | 0.399103581905365 |
| concepts[7].wikidata | https://www.wikidata.org/wiki/Q4830453 |
| concepts[7].display_name | Business |
| concepts[8].id | https://openalex.org/C201995342 |
| concepts[8].level | 1 |
| concepts[8].score | 0.37993091344833374 |
| concepts[8].wikidata | https://www.wikidata.org/wiki/Q682496 |
| concepts[8].display_name | Systems engineering |
| concepts[9].id | https://openalex.org/C170154142 |
| concepts[9].level | 1 |
| concepts[9].score | 0.37608569860458374 |
| concepts[9].wikidata | https://www.wikidata.org/wiki/Q150737 |
| concepts[9].display_name | Architectural engineering |
| concepts[10].id | https://openalex.org/C41008148 |
| concepts[10].level | 0 |
| concepts[10].score | 0.3697492480278015 |
| concepts[10].wikidata | https://www.wikidata.org/wiki/Q21198 |
| concepts[10].display_name | Computer science |
| concepts[11].id | https://openalex.org/C127413603 |
| concepts[11].level | 0 |
| concepts[11].score | 0.2995924651622772 |
| concepts[11].wikidata | https://www.wikidata.org/wiki/Q11023 |
| concepts[11].display_name | Engineering |
| concepts[12].id | https://openalex.org/C21547014 |
| concepts[12].level | 1 |
| concepts[12].score | 0.21525952219963074 |
| concepts[12].wikidata | https://www.wikidata.org/wiki/Q1423657 |
| concepts[12].display_name | Operations management |
| concepts[13].id | https://openalex.org/C206729178 |
| concepts[13].level | 2 |
| concepts[13].score | 0.0 |
| concepts[13].wikidata | https://www.wikidata.org/wiki/Q2271896 |
| concepts[13].display_name | Scheduling (production processes) |
| concepts[14].id | https://openalex.org/C162853370 |
| concepts[14].level | 1 |
| concepts[14].score | 0.0 |
| concepts[14].wikidata | https://www.wikidata.org/wiki/Q39809 |
| concepts[14].display_name | Marketing |
| keywords[0].id | https://openalex.org/keywords/building-information-modeling |
| keywords[0].score | 0.8074862957000732 |
| keywords[0].display_name | Building information modeling |
| keywords[1].id | https://openalex.org/keywords/facility-management |
| keywords[1].score | 0.5716736316680908 |
| keywords[1].display_name | Facility management |
| keywords[2].id | https://openalex.org/keywords/process-management |
| keywords[2].score | 0.4961720407009125 |
| keywords[2].display_name | Process management |
| keywords[3].id | https://openalex.org/keywords/construction-engineering |
| keywords[3].score | 0.4899827539920807 |
| keywords[3].display_name | Construction engineering |
| keywords[4].id | https://openalex.org/keywords/engineering-management |
| keywords[4].score | 0.46152013540267944 |
| keywords[4].display_name | Engineering management |
| keywords[5].id | https://openalex.org/keywords/information-management |
| keywords[5].score | 0.45222052931785583 |
| keywords[5].display_name | Information management |
| keywords[6].id | https://openalex.org/keywords/knowledge-management |
| keywords[6].score | 0.4071298837661743 |
| keywords[6].display_name | Knowledge management |
| keywords[7].id | https://openalex.org/keywords/business |
| keywords[7].score | 0.399103581905365 |
| keywords[7].display_name | Business |
| keywords[8].id | https://openalex.org/keywords/systems-engineering |
| keywords[8].score | 0.37993091344833374 |
| keywords[8].display_name | Systems engineering |
| keywords[9].id | https://openalex.org/keywords/architectural-engineering |
| keywords[9].score | 0.37608569860458374 |
| keywords[9].display_name | Architectural engineering |
| keywords[10].id | https://openalex.org/keywords/computer-science |
| keywords[10].score | 0.3697492480278015 |
| keywords[10].display_name | Computer science |
| keywords[11].id | https://openalex.org/keywords/engineering |
| keywords[11].score | 0.2995924651622772 |
| keywords[11].display_name | Engineering |
| keywords[12].id | https://openalex.org/keywords/operations-management |
| keywords[12].score | 0.21525952219963074 |
| keywords[12].display_name | Operations management |
| language | en |
| locations[0].id | doi:10.24191/bej.v21isi.2420 |
| locations[0].is_oa | True |
| locations[0].source.id | https://openalex.org/S4210208328 |
| locations[0].source.issn | 1675-5022, 2637-0395 |
| locations[0].source.type | journal |
| locations[0].source.is_oa | False |
| locations[0].source.issn_l | 1675-5022 |
| locations[0].source.is_core | False |
| locations[0].source.is_in_doaj | False |
| locations[0].source.display_name | Built Environment Journal |
| locations[0].source.host_organization | |
| locations[0].source.host_organization_name | |
| locations[0].license | cc-by-nc-nd |
| locations[0].pdf_url | https://journal.uitm.edu.my/ojs/index.php/BEJ/article/download/2420/3315 |
| locations[0].version | publishedVersion |
| locations[0].raw_type | journal-article |
| locations[0].license_id | https://openalex.org/licenses/cc-by-nc-nd |
| locations[0].is_accepted | True |
| locations[0].is_published | True |
| locations[0].raw_source_name | Built Environment Journal |
| locations[0].landing_page_url | https://doi.org/10.24191/bej.v21isi.2420 |
| indexed_in | crossref |
| authorships[0].author.id | https://openalex.org/A5038695721 |
| authorships[0].author.orcid | https://orcid.org/0000-0002-2611-4853 |
| authorships[0].author.display_name | Nagwa A. Sabri |
| authorships[0].author_position | first |
| authorships[0].raw_author_name | Nor Audra Laily Mohd Sabri |
| authorships[0].is_corresponding | False |
| authorships[1].author.id | https://openalex.org/A5064960176 |
| authorships[1].author.orcid | |
| authorships[1].author.display_name | Siti Nor Azniza Ahmad Sekak |
| authorships[1].author_position | middle |
| authorships[1].raw_author_name | Siti Nor Azniza Ahmad Sekak |
| authorships[1].is_corresponding | False |
| authorships[2].author.id | https://openalex.org/A5071303799 |
| authorships[2].author.orcid | |
| authorships[2].author.display_name | Yusmady Md Junus |
| authorships[2].author_position | last |
| authorships[2].raw_author_name | Yusmady Md Junus |
| authorships[2].is_corresponding | False |
| has_content.pdf | True |
| has_content.grobid_xml | True |
| is_paratext | False |
| open_access.is_oa | True |
| open_access.oa_url | https://journal.uitm.edu.my/ojs/index.php/BEJ/article/download/2420/3315 |
| open_access.oa_status | hybrid |
| open_access.any_repository_has_fulltext | False |
| created_date | 2025-10-10T00:00:00 |
| display_name | Issues and Challenges of Building Information Modelling (BIM) Implementation in Facilities Management |
| has_fulltext | False |
| is_retracted | False |
| updated_date | 2025-11-06T03:46:38.306776 |
| primary_topic.id | https://openalex.org/T11006 |
| primary_topic.field.id | https://openalex.org/fields/22 |
| primary_topic.field.display_name | Engineering |
| primary_topic.score | 0.9898999929428101 |
| primary_topic.domain.id | https://openalex.org/domains/3 |
| primary_topic.domain.display_name | Physical Sciences |
| primary_topic.subfield.id | https://openalex.org/subfields/2215 |
| primary_topic.subfield.display_name | Building and Construction |
| primary_topic.display_name | BIM and Construction Integration |
| related_works | https://openalex.org/W2911573234, https://openalex.org/W2888986163, https://openalex.org/W4205585768, https://openalex.org/W2802801722, https://openalex.org/W2989566038, https://openalex.org/W2086556168, https://openalex.org/W2556233008, https://openalex.org/W3114296141, https://openalex.org/W2550265295, https://openalex.org/W2990504499 |
| cited_by_count | 1 |
| counts_by_year[0].year | 2025 |
| counts_by_year[0].cited_by_count | 1 |
| locations_count | 1 |
| best_oa_location.id | doi:10.24191/bej.v21isi.2420 |
| best_oa_location.is_oa | True |
| best_oa_location.source.id | https://openalex.org/S4210208328 |
| best_oa_location.source.issn | 1675-5022, 2637-0395 |
| best_oa_location.source.type | journal |
| best_oa_location.source.is_oa | False |
| best_oa_location.source.issn_l | 1675-5022 |
| best_oa_location.source.is_core | False |
| best_oa_location.source.is_in_doaj | False |
| best_oa_location.source.display_name | Built Environment Journal |
| best_oa_location.source.host_organization | |
| best_oa_location.source.host_organization_name | |
| best_oa_location.license | cc-by-nc-nd |
| best_oa_location.pdf_url | https://journal.uitm.edu.my/ojs/index.php/BEJ/article/download/2420/3315 |
| best_oa_location.version | publishedVersion |
| best_oa_location.raw_type | journal-article |
| best_oa_location.license_id | https://openalex.org/licenses/cc-by-nc-nd |
| best_oa_location.is_accepted | True |
| best_oa_location.is_published | True |
| best_oa_location.raw_source_name | Built Environment Journal |
| best_oa_location.landing_page_url | https://doi.org/10.24191/bej.v21isi.2420 |
| primary_location.id | doi:10.24191/bej.v21isi.2420 |
| primary_location.is_oa | True |
| primary_location.source.id | https://openalex.org/S4210208328 |
| primary_location.source.issn | 1675-5022, 2637-0395 |
| primary_location.source.type | journal |
| primary_location.source.is_oa | False |
| primary_location.source.issn_l | 1675-5022 |
| primary_location.source.is_core | False |
| primary_location.source.is_in_doaj | False |
| primary_location.source.display_name | Built Environment Journal |
| primary_location.source.host_organization | |
| primary_location.source.host_organization_name | |
| primary_location.license | cc-by-nc-nd |
| primary_location.pdf_url | https://journal.uitm.edu.my/ojs/index.php/BEJ/article/download/2420/3315 |
| primary_location.version | publishedVersion |
| primary_location.raw_type | journal-article |
| primary_location.license_id | https://openalex.org/licenses/cc-by-nc-nd |
| primary_location.is_accepted | True |
| primary_location.is_published | True |
| primary_location.raw_source_name | Built Environment Journal |
| primary_location.landing_page_url | https://doi.org/10.24191/bej.v21isi.2420 |
| publication_date | 2025-05-01 |
| publication_year | 2025 |
| referenced_works_count | 0 |
| abstract_inverted_index.a | 43, 134, 178, 190, 238 |
| abstract_inverted_index.19 | 175 |
| abstract_inverted_index.57 | 158 |
| abstract_inverted_index.As | 237 |
| abstract_inverted_index.FM | 29, 101, 119, 163, 210, 229 |
| abstract_inverted_index.as | 153, 249, 251 |
| abstract_inverted_index.by | 137 |
| abstract_inverted_index.in | 30, 82, 99, 118, 128, 166, 199, 209, 245, 262 |
| abstract_inverted_index.is | 4, 42, 67, 132, 211, 256 |
| abstract_inverted_index.of | 6, 45, 47, 58, 64, 80, 87, 97, 105, 115, 156, 186, 192, 203, 214, 223 |
| abstract_inverted_index.on | 50, 169 |
| abstract_inverted_index.to | 27, 68, 91, 109, 121, 144, 162 |
| abstract_inverted_index.33% | 179 |
| abstract_inverted_index.AEC | 263 |
| abstract_inverted_index.BIM | 13, 52, 81, 98, 116, 127, 197, 207, 217, 232, 244, 252, 260 |
| abstract_inverted_index.FM, | 83 |
| abstract_inverted_index.FM. | 129, 201, 219 |
| abstract_inverted_index.One | 202 |
| abstract_inverted_index.The | 39, 103, 184 |
| abstract_inverted_index.aim | 63 |
| abstract_inverted_index.and | 37, 70, 74, 95, 113, 120, 141, 194, 218, 227, 254 |
| abstract_inverted_index.are | 108 |
| abstract_inverted_index.but | 173 |
| abstract_inverted_index.for | 15, 125, 242, 258 |
| abstract_inverted_index.has | 19 |
| abstract_inverted_index.not | 20 |
| abstract_inverted_index.one | 5 |
| abstract_inverted_index.the | 7, 33, 51, 55, 59, 62, 72, 78, 85, 93, 100, 106, 111, 123, 146, 154, 170, 204, 212, 221, 246 |
| abstract_inverted_index.was | 151 |
| abstract_inverted_index.yet | 21 |
| abstract_inverted_index.(FM) | 18 |
| abstract_inverted_index.MAFM | 171 |
| abstract_inverted_index.SPSS | 142 |
| abstract_inverted_index.This | 130 |
| abstract_inverted_index.been | 22 |
| abstract_inverted_index.goal | 86 |
| abstract_inverted_index.lack | 44, 213 |
| abstract_inverted_index.life | 56 |
| abstract_inverted_index.only | 174 |
| abstract_inverted_index.rate | 181 |
| abstract_inverted_index.this | 65, 187 |
| abstract_inverted_index.well | 250 |
| abstract_inverted_index.were | 160, 182 |
| abstract_inverted_index.with | 77, 84, 177, 196, 206, 231 |
| abstract_inverted_index.(BIM) | 3 |
| abstract_inverted_index.based | 168 |
| abstract_inverted_index.cause | 41 |
| abstract_inverted_index.cycle | 57 |
| abstract_inverted_index.data. | 148 |
| abstract_inverted_index.drive | 28 |
| abstract_inverted_index.other | 228 |
| abstract_inverted_index.study | 122, 188 |
| abstract_inverted_index.using | 133 |
| abstract_inverted_index.causes | 234 |
| abstract_inverted_index.issues | 112, 193, 205 |
| abstract_inverted_index.likely | 40 |
| abstract_inverted_index.method | 155 |
| abstract_inverted_index.online | 138 |
| abstract_inverted_index.survey | 140 |
| abstract_inverted_index.analyse | 71 |
| abstract_inverted_index.applied | 152 |
| abstract_inverted_index.between | 216 |
| abstract_inverted_index.enhance | 92 |
| abstract_inverted_index.explore | 69 |
| abstract_inverted_index.issues. | 236 |
| abstract_inverted_index.method, | 136 |
| abstract_inverted_index.result, | 239 |
| abstract_inverted_index.sector. | 102 |
| abstract_inverted_index.support | 241 |
| abstract_inverted_index.systems | 226 |
| abstract_inverted_index.variety | 191 |
| abstract_inverted_index.Building | 0 |
| abstract_inverted_index.However, | 12, 220 |
| abstract_inverted_index.Malaysia | 167 |
| abstract_inverted_index.adoption | 14, 94 |
| abstract_inverted_index.analyses | 145 |
| abstract_inverted_index.building | 224 |
| abstract_inverted_index.continue | 26 |
| abstract_inverted_index.critical | 257 |
| abstract_inverted_index.economic | 35 |
| abstract_inverted_index.emerging | 9 |
| abstract_inverted_index.exchange | 49 |
| abstract_inverted_index.findings | 185 |
| abstract_inverted_index.insights | 90 |
| abstract_inverted_index.platform | 53 |
| abstract_inverted_index.project. | 60 |
| abstract_inverted_index.research | 66, 107, 131 |
| abstract_inverted_index.response | 180 |
| abstract_inverted_index.revealed | 189 |
| abstract_inverted_index.sampling | 150 |
| abstract_inverted_index.website, | 172 |
| abstract_inverted_index.Malaysia, | 31 |
| abstract_inverted_index.Malaysian | 200 |
| abstract_inverted_index.Modelling | 2 |
| abstract_inverted_index.collected | 147 |
| abstract_inverted_index.companies | 165 |
| abstract_inverted_index.corporate | 164 |
| abstract_inverted_index.country's | 34 |
| abstract_inverted_index.education | 253 |
| abstract_inverted_index.industry, | 248 |
| abstract_inverted_index.processes | 25 |
| abstract_inverted_index.promoting | 243 |
| abstract_inverted_index.providing | 88 |
| abstract_inverted_index.received. | 183 |
| abstract_inverted_index.responses | 176 |
| abstract_inverted_index.sampling. | 157 |
| abstract_inverted_index.software, | 143 |
| abstract_inverted_index.training, | 255 |
| abstract_inverted_index.typically | 233 |
| abstract_inverted_index.Facilities | 16 |
| abstract_inverted_index.Management | 17 |
| abstract_inverted_index.actionable | 89 |
| abstract_inverted_index.adaptation | 261 |
| abstract_inverted_index.associated | 76 |
| abstract_inverted_index.automation | 225 |
| abstract_inverted_index.challenges | 73, 114, 195 |
| abstract_inverted_index.government | 240 |
| abstract_inverted_index.increasing | 259 |
| abstract_inverted_index.industry's | 8 |
| abstract_inverted_index.objectives | 104 |
| abstract_inverted_index.signalling | 32 |
| abstract_inverted_index.strategies | 75, 124 |
| abstract_inverted_index.throughout | 54 |
| abstract_inverted_index.Information | 1 |
| abstract_inverted_index.Traditional | 24 |
| abstract_inverted_index.development | 36 |
| abstract_inverted_index.distributed | 161 |
| abstract_inverted_index.information | 48 |
| abstract_inverted_index.integration | 215 |
| abstract_inverted_index.investigate | 110 |
| abstract_inverted_index.construction | 10, 247 |
| abstract_inverted_index.implementing | 126 |
| abstract_inverted_index.quantitative | 135 |
| abstract_inverted_index.technologies | 230 |
| abstract_inverted_index.Consequently, | 61 |
| abstract_inverted_index.acknowledged. | 23 |
| abstract_inverted_index.comprehension | 46 |
| abstract_inverted_index.effectiveness | 96 |
| abstract_inverted_index.questionnaire | 139 |
| abstract_inverted_index.technologies. | 11 |
| abstract_inverted_index.implementation | 79, 117, 198, 208 |
| abstract_inverted_index.organisations. | 264 |
| abstract_inverted_index.questionnaires | 159 |
| abstract_inverted_index.Non-probability | 149 |
| abstract_inverted_index.incompatibility | 222 |
| abstract_inverted_index.competitiveness. | 38 |
| abstract_inverted_index.interoperability | 235 |
| cited_by_percentile_year.max | 95 |
| cited_by_percentile_year.min | 91 |
| countries_distinct_count | 0 |
| institutions_distinct_count | 3 |
| citation_normalized_percentile.value | 0.81778564 |
| citation_normalized_percentile.is_in_top_1_percent | False |
| citation_normalized_percentile.is_in_top_10_percent | True |