Layout of the New Septum Magnets for Fast Extraction in J-PARC Main Ring Article Swipe
Related Concepts
Magnet
Ring (chemistry)
J-PARC
Extraction (chemistry)
Physics
Engineering
Mechanical engineering
Structural engineering
Chemistry
Organic chemistry
Beam (structure)
Chromatography
S. Iwata
,
K. Ishii
,
Hiroshi Matsumoto
,
N. Matsumoto
,
Yoichi Sato
,
T. Shibata
,
T. Sugimoto
·
YOU?
·
· 2021
· Open Access
·
· DOI: https://doi.org/10.18429/jacow-ipac2021-wepab204
· OA: W3202289728
YOU?
·
· 2021
· Open Access
·
· DOI: https://doi.org/10.18429/jacow-ipac2021-wepab204
· OA: W3202289728
At J-PARC Main Ring (MR), we are pursuing to improve the beam power from 500 kW to 1.3 MW by reducing the repetition cycle from 2.48 to 1.16 seconds (1 Hz operation). Additionally, we are considering the beam particles increasing by selecting a more optimal tune. The fast extraction (FX) equipment to the neutrino facility (NU) is needed to upgrade for the 1 Hz operation. We plan to replace most FX septum magnets with new ones in 2021. We report a layout of the FX line in confirmation of new beam optics and mention the beam loss during the fast extraction.
Related Topics
Finding more related topics…