On Determining the Critical Path of Activity Network with Normalized Heptagonal Fuzzy Data Article Swipe
YOU?
·
· 2021
· Open Access
·
· DOI: https://doi.org/10.1155/2021/6699403
In this research work, an approach to determine the critical path of activity network with normalized heptagonal fuzzy data is proposed. In the proposed model, we attempt to develop a method for solving litigation problems by experts when they share the same information but differ in their opinions. The concepts for a critical path method (CPM) optimization with two kinds of data are as follows: those are to be optimistic and those considered being pessimistic. A numerical example is given for the illustration of the proposed approach and gain more insights. Based on the findings of the proposed work, we observe that the floating times with optimistic data are always smaller than or equal to the corresponding floating times for the pessimistic data.
Related Topics
- Type
- article
- Language
- en
- Landing Page
- https://doi.org/10.1155/2021/6699403
- https://downloads.hindawi.com/journals/wcmc/2021/6699403.pdf
- OA Status
- hybrid
- Cited By
- 8
- References
- 29
- Related Works
- 10
- OpenAlex ID
- https://openalex.org/W3177617506
Raw OpenAlex JSON
- OpenAlex ID
-
https://openalex.org/W3177617506Canonical identifier for this work in OpenAlex
- DOI
-
https://doi.org/10.1155/2021/6699403Digital Object Identifier
- Title
-
On Determining the Critical Path of Activity Network with Normalized Heptagonal Fuzzy DataWork title
- Type
-
articleOpenAlex work type
- Language
-
enPrimary language
- Publication year
-
2021Year of publication
- Publication date
-
2021-01-01Full publication date if available
- Authors
-
Hamiden Abd El-Wahed Khalifa, Majed Alharbi, Pavan KumarList of authors in order
- Landing page
-
https://doi.org/10.1155/2021/6699403Publisher landing page
- PDF URL
-
https://downloads.hindawi.com/journals/wcmc/2021/6699403.pdfDirect link to full text PDF
- Open access
-
YesWhether a free full text is available
- OA status
-
hybridOpen access status per OpenAlex
- OA URL
-
https://downloads.hindawi.com/journals/wcmc/2021/6699403.pdfDirect OA link when available
- Concepts
-
Computer science, Path (computing), Pessimism, Fuzzy logic, Critical path method, Work (physics), Data mining, Algorithm, Artificial intelligence, Systems engineering, Philosophy, Epistemology, Programming language, Mechanical engineering, EngineeringTop concepts (fields/topics) attached by OpenAlex
- Cited by
-
8Total citation count in OpenAlex
- Citations by year (recent)
-
2024: 2, 2023: 4, 2022: 2Per-year citation counts (last 5 years)
- References (count)
-
29Number of works referenced by this work
- Related works (count)
-
10Other works algorithmically related by OpenAlex
Full payload
| id | https://openalex.org/W3177617506 |
|---|---|
| doi | https://doi.org/10.1155/2021/6699403 |
| ids.doi | https://doi.org/10.1155/2021/6699403 |
| ids.mag | 3177617506 |
| ids.openalex | https://openalex.org/W3177617506 |
| fwci | 1.06266327 |
| type | article |
| title | On Determining the Critical Path of Activity Network with Normalized Heptagonal Fuzzy Data |
| biblio.issue | 1 |
| biblio.volume | 2021 |
| biblio.last_page | |
| biblio.first_page | |
| topics[0].id | https://openalex.org/T12709 |
| topics[0].field.id | https://openalex.org/fields/22 |
| topics[0].field.display_name | Engineering |
| topics[0].score | 0.9983000159263611 |
| topics[0].domain.id | https://openalex.org/domains/3 |
| topics[0].domain.display_name | Physical Sciences |
| topics[0].subfield.id | https://openalex.org/subfields/2207 |
| topics[0].subfield.display_name | Control and Systems Engineering |
| topics[0].display_name | Optimization and Mathematical Programming |
| topics[1].id | https://openalex.org/T10050 |
| topics[1].field.id | https://openalex.org/fields/18 |
| topics[1].field.display_name | Decision Sciences |
| topics[1].score | 0.9940999746322632 |
| topics[1].domain.id | https://openalex.org/domains/2 |
| topics[1].domain.display_name | Social Sciences |
| topics[1].subfield.id | https://openalex.org/subfields/1803 |
| topics[1].subfield.display_name | Management Science and Operations Research |
| topics[1].display_name | Multi-Criteria Decision Making |
| topics[2].id | https://openalex.org/T12177 |
| topics[2].field.id | https://openalex.org/fields/18 |
| topics[2].field.display_name | Decision Sciences |
| topics[2].score | 0.9902999997138977 |
| topics[2].domain.id | https://openalex.org/domains/2 |
| topics[2].domain.display_name | Social Sciences |
| topics[2].subfield.id | https://openalex.org/subfields/1803 |
| topics[2].subfield.display_name | Management Science and Operations Research |
| topics[2].display_name | Resource-Constrained Project Scheduling |
| is_xpac | False |
| apc_list.value | 2300 |
| apc_list.currency | USD |
| apc_list.value_usd | 2300 |
| apc_paid.value | 2300 |
| apc_paid.currency | USD |
| apc_paid.value_usd | 2300 |
| concepts[0].id | https://openalex.org/C41008148 |
| concepts[0].level | 0 |
| concepts[0].score | 0.7987731695175171 |
| concepts[0].wikidata | https://www.wikidata.org/wiki/Q21198 |
| concepts[0].display_name | Computer science |
| concepts[1].id | https://openalex.org/C2777735758 |
| concepts[1].level | 2 |
| concepts[1].score | 0.7255489230155945 |
| concepts[1].wikidata | https://www.wikidata.org/wiki/Q817765 |
| concepts[1].display_name | Path (computing) |
| concepts[2].id | https://openalex.org/C9992130 |
| concepts[2].level | 2 |
| concepts[2].score | 0.6263630390167236 |
| concepts[2].wikidata | https://www.wikidata.org/wiki/Q484954 |
| concepts[2].display_name | Pessimism |
| concepts[3].id | https://openalex.org/C58166 |
| concepts[3].level | 2 |
| concepts[3].score | 0.5812206864356995 |
| concepts[3].wikidata | https://www.wikidata.org/wiki/Q224821 |
| concepts[3].display_name | Fuzzy logic |
| concepts[4].id | https://openalex.org/C115874739 |
| concepts[4].level | 2 |
| concepts[4].score | 0.5662612318992615 |
| concepts[4].wikidata | https://www.wikidata.org/wiki/Q825377 |
| concepts[4].display_name | Critical path method |
| concepts[5].id | https://openalex.org/C18762648 |
| concepts[5].level | 2 |
| concepts[5].score | 0.4941568672657013 |
| concepts[5].wikidata | https://www.wikidata.org/wiki/Q42213 |
| concepts[5].display_name | Work (physics) |
| concepts[6].id | https://openalex.org/C124101348 |
| concepts[6].level | 1 |
| concepts[6].score | 0.4182559847831726 |
| concepts[6].wikidata | https://www.wikidata.org/wiki/Q172491 |
| concepts[6].display_name | Data mining |
| concepts[7].id | https://openalex.org/C11413529 |
| concepts[7].level | 1 |
| concepts[7].score | 0.4162452816963196 |
| concepts[7].wikidata | https://www.wikidata.org/wiki/Q8366 |
| concepts[7].display_name | Algorithm |
| concepts[8].id | https://openalex.org/C154945302 |
| concepts[8].level | 1 |
| concepts[8].score | 0.23909679055213928 |
| concepts[8].wikidata | https://www.wikidata.org/wiki/Q11660 |
| concepts[8].display_name | Artificial intelligence |
| concepts[9].id | https://openalex.org/C201995342 |
| concepts[9].level | 1 |
| concepts[9].score | 0.0 |
| concepts[9].wikidata | https://www.wikidata.org/wiki/Q682496 |
| concepts[9].display_name | Systems engineering |
| concepts[10].id | https://openalex.org/C138885662 |
| concepts[10].level | 0 |
| concepts[10].score | 0.0 |
| concepts[10].wikidata | https://www.wikidata.org/wiki/Q5891 |
| concepts[10].display_name | Philosophy |
| concepts[11].id | https://openalex.org/C111472728 |
| concepts[11].level | 1 |
| concepts[11].score | 0.0 |
| concepts[11].wikidata | https://www.wikidata.org/wiki/Q9471 |
| concepts[11].display_name | Epistemology |
| concepts[12].id | https://openalex.org/C199360897 |
| concepts[12].level | 1 |
| concepts[12].score | 0.0 |
| concepts[12].wikidata | https://www.wikidata.org/wiki/Q9143 |
| concepts[12].display_name | Programming language |
| concepts[13].id | https://openalex.org/C78519656 |
| concepts[13].level | 1 |
| concepts[13].score | 0.0 |
| concepts[13].wikidata | https://www.wikidata.org/wiki/Q101333 |
| concepts[13].display_name | Mechanical engineering |
| concepts[14].id | https://openalex.org/C127413603 |
| concepts[14].level | 0 |
| concepts[14].score | 0.0 |
| concepts[14].wikidata | https://www.wikidata.org/wiki/Q11023 |
| concepts[14].display_name | Engineering |
| keywords[0].id | https://openalex.org/keywords/computer-science |
| keywords[0].score | 0.7987731695175171 |
| keywords[0].display_name | Computer science |
| keywords[1].id | https://openalex.org/keywords/path |
| keywords[1].score | 0.7255489230155945 |
| keywords[1].display_name | Path (computing) |
| keywords[2].id | https://openalex.org/keywords/pessimism |
| keywords[2].score | 0.6263630390167236 |
| keywords[2].display_name | Pessimism |
| keywords[3].id | https://openalex.org/keywords/fuzzy-logic |
| keywords[3].score | 0.5812206864356995 |
| keywords[3].display_name | Fuzzy logic |
| keywords[4].id | https://openalex.org/keywords/critical-path-method |
| keywords[4].score | 0.5662612318992615 |
| keywords[4].display_name | Critical path method |
| keywords[5].id | https://openalex.org/keywords/work |
| keywords[5].score | 0.4941568672657013 |
| keywords[5].display_name | Work (physics) |
| keywords[6].id | https://openalex.org/keywords/data-mining |
| keywords[6].score | 0.4182559847831726 |
| keywords[6].display_name | Data mining |
| keywords[7].id | https://openalex.org/keywords/algorithm |
| keywords[7].score | 0.4162452816963196 |
| keywords[7].display_name | Algorithm |
| keywords[8].id | https://openalex.org/keywords/artificial-intelligence |
| keywords[8].score | 0.23909679055213928 |
| keywords[8].display_name | Artificial intelligence |
| language | en |
| locations[0].id | doi:10.1155/2021/6699403 |
| locations[0].is_oa | True |
| locations[0].source.id | https://openalex.org/S235346 |
| locations[0].source.issn | 1530-8669, 1530-8677 |
| locations[0].source.type | journal |
| locations[0].source.is_oa | False |
| locations[0].source.issn_l | 1530-8669 |
| locations[0].source.is_core | True |
| locations[0].source.is_in_doaj | False |
| locations[0].source.display_name | Wireless Communications and Mobile Computing |
| locations[0].source.host_organization | https://openalex.org/P4310320595 |
| locations[0].source.host_organization_name | Wiley |
| locations[0].source.host_organization_lineage | https://openalex.org/P4310320595 |
| locations[0].source.host_organization_lineage_names | Wiley |
| locations[0].license | cc-by |
| locations[0].pdf_url | https://downloads.hindawi.com/journals/wcmc/2021/6699403.pdf |
| locations[0].version | publishedVersion |
| locations[0].raw_type | journal-article |
| locations[0].license_id | https://openalex.org/licenses/cc-by |
| locations[0].is_accepted | True |
| locations[0].is_published | True |
| locations[0].raw_source_name | Wireless Communications and Mobile Computing |
| locations[0].landing_page_url | https://doi.org/10.1155/2021/6699403 |
| locations[1].id | pmh:oai:doaj.org/article:c292fa5827824144bf6d99a566c3eec5 |
| locations[1].is_oa | False |
| locations[1].source.id | https://openalex.org/S4306401280 |
| locations[1].source.issn | |
| locations[1].source.type | repository |
| locations[1].source.is_oa | False |
| locations[1].source.issn_l | |
| locations[1].source.is_core | False |
| locations[1].source.is_in_doaj | False |
| locations[1].source.display_name | DOAJ (DOAJ: Directory of Open Access Journals) |
| locations[1].source.host_organization | |
| locations[1].source.host_organization_name | |
| locations[1].license | |
| locations[1].pdf_url | |
| locations[1].version | submittedVersion |
| locations[1].raw_type | article |
| locations[1].license_id | |
| locations[1].is_accepted | False |
| locations[1].is_published | False |
| locations[1].raw_source_name | Wireless Communications and Mobile Computing, Vol 2021 (2021) |
| locations[1].landing_page_url | https://doaj.org/article/c292fa5827824144bf6d99a566c3eec5 |
| indexed_in | crossref, doaj |
| authorships[0].author.id | https://openalex.org/A5103023240 |
| authorships[0].author.orcid | |
| authorships[0].author.display_name | Hamiden Abd El-Wahed Khalifa |
| authorships[0].countries | EG, SA |
| authorships[0].affiliations[0].institution_ids | https://openalex.org/I156216236 |
| authorships[0].affiliations[0].raw_affiliation_string | Mathematics Department, College of Science and Arts, Al-Badaya, Qassim University, Buraydah, Saudi Arabia |
| authorships[0].affiliations[1].institution_ids | https://openalex.org/I145487455 |
| authorships[0].affiliations[1].raw_affiliation_string | Operations Research Department, Faculty of Graduate Studies for Statistical Research, Cairo University, Giza, Egypt |
| authorships[0].institutions[0].id | https://openalex.org/I145487455 |
| authorships[0].institutions[0].ror | https://ror.org/03q21mh05 |
| authorships[0].institutions[0].type | education |
| authorships[0].institutions[0].lineage | https://openalex.org/I145487455 |
| authorships[0].institutions[0].country_code | EG |
| authorships[0].institutions[0].display_name | Cairo University |
| authorships[0].institutions[1].id | https://openalex.org/I156216236 |
| authorships[0].institutions[1].ror | https://ror.org/01wsfe280 |
| authorships[0].institutions[1].type | education |
| authorships[0].institutions[1].lineage | https://openalex.org/I156216236 |
| authorships[0].institutions[1].country_code | SA |
| authorships[0].institutions[1].display_name | Qassim University |
| authorships[0].author_position | first |
| authorships[0].raw_author_name | Hamiden Abd El-Wahed Khalifa |
| authorships[0].is_corresponding | False |
| authorships[0].raw_affiliation_strings | Mathematics Department, College of Science and Arts, Al-Badaya, Qassim University, Buraydah, Saudi Arabia, Operations Research Department, Faculty of Graduate Studies for Statistical Research, Cairo University, Giza, Egypt |
| authorships[1].author.id | https://openalex.org/A5075392453 |
| authorships[1].author.orcid | |
| authorships[1].author.display_name | Majed Alharbi |
| authorships[1].countries | SA |
| authorships[1].affiliations[0].institution_ids | https://openalex.org/I156216236 |
| authorships[1].affiliations[0].raw_affiliation_string | Mathematics Mathematics, College of Science and Arts, Methnab, Qassim University, Saudi Arabia |
| authorships[1].institutions[0].id | https://openalex.org/I156216236 |
| authorships[1].institutions[0].ror | https://ror.org/01wsfe280 |
| authorships[1].institutions[0].type | education |
| authorships[1].institutions[0].lineage | https://openalex.org/I156216236 |
| authorships[1].institutions[0].country_code | SA |
| authorships[1].institutions[0].display_name | Qassim University |
| authorships[1].author_position | middle |
| authorships[1].raw_author_name | Majed G. Alharbi |
| authorships[1].is_corresponding | False |
| authorships[1].raw_affiliation_strings | Mathematics Mathematics, College of Science and Arts, Methnab, Qassim University, Saudi Arabia |
| authorships[2].author.id | https://openalex.org/A5101398697 |
| authorships[2].author.orcid | https://orcid.org/0000-0001-5340-7777 |
| authorships[2].author.display_name | Pavan Kumar |
| authorships[2].countries | IN |
| authorships[2].affiliations[0].institution_ids | https://openalex.org/I464993 |
| authorships[2].affiliations[0].raw_affiliation_string | Mathematics Division, School of Advanced Sciences & Languages, VIT Bhopal University, Sehore-466114, MP, India |
| authorships[2].institutions[0].id | https://openalex.org/I464993 |
| authorships[2].institutions[0].ror | https://ror.org/02ax13658 |
| authorships[2].institutions[0].type | education |
| authorships[2].institutions[0].lineage | https://openalex.org/I464993 |
| authorships[2].institutions[0].country_code | IN |
| authorships[2].institutions[0].display_name | Barkatullah University |
| authorships[2].author_position | last |
| authorships[2].raw_author_name | Pavan Kumar |
| authorships[2].is_corresponding | True |
| authorships[2].raw_affiliation_strings | Mathematics Division, School of Advanced Sciences & Languages, VIT Bhopal University, Sehore-466114, MP, India |
| has_content.pdf | True |
| has_content.grobid_xml | True |
| is_paratext | False |
| open_access.is_oa | True |
| open_access.oa_url | https://downloads.hindawi.com/journals/wcmc/2021/6699403.pdf |
| open_access.oa_status | hybrid |
| open_access.any_repository_has_fulltext | False |
| created_date | 2025-10-10T00:00:00 |
| display_name | On Determining the Critical Path of Activity Network with Normalized Heptagonal Fuzzy Data |
| has_fulltext | True |
| is_retracted | False |
| updated_date | 2025-11-06T03:46:38.306776 |
| primary_topic.id | https://openalex.org/T12709 |
| primary_topic.field.id | https://openalex.org/fields/22 |
| primary_topic.field.display_name | Engineering |
| primary_topic.score | 0.9983000159263611 |
| primary_topic.domain.id | https://openalex.org/domains/3 |
| primary_topic.domain.display_name | Physical Sciences |
| primary_topic.subfield.id | https://openalex.org/subfields/2207 |
| primary_topic.subfield.display_name | Control and Systems Engineering |
| primary_topic.display_name | Optimization and Mathematical Programming |
| related_works | https://openalex.org/W4380987628, https://openalex.org/W2418537576, https://openalex.org/W2557514562, https://openalex.org/W214945085, https://openalex.org/W1987935396, https://openalex.org/W3126025002, https://openalex.org/W2365007040, https://openalex.org/W1970519101, https://openalex.org/W2045633099, https://openalex.org/W1910575119 |
| cited_by_count | 8 |
| counts_by_year[0].year | 2024 |
| counts_by_year[0].cited_by_count | 2 |
| counts_by_year[1].year | 2023 |
| counts_by_year[1].cited_by_count | 4 |
| counts_by_year[2].year | 2022 |
| counts_by_year[2].cited_by_count | 2 |
| locations_count | 2 |
| best_oa_location.id | doi:10.1155/2021/6699403 |
| best_oa_location.is_oa | True |
| best_oa_location.source.id | https://openalex.org/S235346 |
| best_oa_location.source.issn | 1530-8669, 1530-8677 |
| best_oa_location.source.type | journal |
| best_oa_location.source.is_oa | False |
| best_oa_location.source.issn_l | 1530-8669 |
| best_oa_location.source.is_core | True |
| best_oa_location.source.is_in_doaj | False |
| best_oa_location.source.display_name | Wireless Communications and Mobile Computing |
| best_oa_location.source.host_organization | https://openalex.org/P4310320595 |
| best_oa_location.source.host_organization_name | Wiley |
| best_oa_location.source.host_organization_lineage | https://openalex.org/P4310320595 |
| best_oa_location.source.host_organization_lineage_names | Wiley |
| best_oa_location.license | cc-by |
| best_oa_location.pdf_url | https://downloads.hindawi.com/journals/wcmc/2021/6699403.pdf |
| best_oa_location.version | publishedVersion |
| best_oa_location.raw_type | journal-article |
| best_oa_location.license_id | https://openalex.org/licenses/cc-by |
| best_oa_location.is_accepted | True |
| best_oa_location.is_published | True |
| best_oa_location.raw_source_name | Wireless Communications and Mobile Computing |
| best_oa_location.landing_page_url | https://doi.org/10.1155/2021/6699403 |
| primary_location.id | doi:10.1155/2021/6699403 |
| primary_location.is_oa | True |
| primary_location.source.id | https://openalex.org/S235346 |
| primary_location.source.issn | 1530-8669, 1530-8677 |
| primary_location.source.type | journal |
| primary_location.source.is_oa | False |
| primary_location.source.issn_l | 1530-8669 |
| primary_location.source.is_core | True |
| primary_location.source.is_in_doaj | False |
| primary_location.source.display_name | Wireless Communications and Mobile Computing |
| primary_location.source.host_organization | https://openalex.org/P4310320595 |
| primary_location.source.host_organization_name | Wiley |
| primary_location.source.host_organization_lineage | https://openalex.org/P4310320595 |
| primary_location.source.host_organization_lineage_names | Wiley |
| primary_location.license | cc-by |
| primary_location.pdf_url | https://downloads.hindawi.com/journals/wcmc/2021/6699403.pdf |
| primary_location.version | publishedVersion |
| primary_location.raw_type | journal-article |
| primary_location.license_id | https://openalex.org/licenses/cc-by |
| primary_location.is_accepted | True |
| primary_location.is_published | True |
| primary_location.raw_source_name | Wireless Communications and Mobile Computing |
| primary_location.landing_page_url | https://doi.org/10.1155/2021/6699403 |
| publication_date | 2021-01-01 |
| publication_year | 2021 |
| referenced_works | https://openalex.org/W2076795368, https://openalex.org/W2038153302, https://openalex.org/W1512242521, https://openalex.org/W2123862452, https://openalex.org/W4211007335, https://openalex.org/W4292158025, https://openalex.org/W2099867994, https://openalex.org/W2009479118, https://openalex.org/W2047031031, https://openalex.org/W156651540, https://openalex.org/W2019561606, https://openalex.org/W2026060488, https://openalex.org/W2008720916, https://openalex.org/W1983043022, https://openalex.org/W2410534268, https://openalex.org/W1983726255, https://openalex.org/W2109190387, https://openalex.org/W1968829028, https://openalex.org/W2132156969, https://openalex.org/W2077653783, https://openalex.org/W1537097599, https://openalex.org/W2808734081, https://openalex.org/W2132622669, https://openalex.org/W2003610871, https://openalex.org/W3091209362, https://openalex.org/W3134716184, https://openalex.org/W3123232098, https://openalex.org/W1994997349, https://openalex.org/W2330022088 |
| referenced_works_count | 29 |
| abstract_inverted_index.A | 75 |
| abstract_inverted_index.a | 29, 51 |
| abstract_inverted_index.In | 0, 21 |
| abstract_inverted_index.an | 4 |
| abstract_inverted_index.as | 63 |
| abstract_inverted_index.be | 68 |
| abstract_inverted_index.by | 35 |
| abstract_inverted_index.in | 45 |
| abstract_inverted_index.is | 19, 78 |
| abstract_inverted_index.of | 11, 60, 83, 95 |
| abstract_inverted_index.on | 92 |
| abstract_inverted_index.or | 112 |
| abstract_inverted_index.to | 6, 27, 67, 114 |
| abstract_inverted_index.we | 25, 99 |
| abstract_inverted_index.The | 48 |
| abstract_inverted_index.and | 70, 87 |
| abstract_inverted_index.are | 62, 66, 108 |
| abstract_inverted_index.but | 43 |
| abstract_inverted_index.for | 31, 50, 80, 119 |
| abstract_inverted_index.the | 8, 22, 40, 81, 84, 93, 96, 102, 115, 120 |
| abstract_inverted_index.two | 58 |
| abstract_inverted_index.data | 18, 61, 107 |
| abstract_inverted_index.gain | 88 |
| abstract_inverted_index.more | 89 |
| abstract_inverted_index.path | 10, 53 |
| abstract_inverted_index.same | 41 |
| abstract_inverted_index.than | 111 |
| abstract_inverted_index.that | 101 |
| abstract_inverted_index.they | 38 |
| abstract_inverted_index.this | 1 |
| abstract_inverted_index.when | 37 |
| abstract_inverted_index.with | 14, 57, 105 |
| abstract_inverted_index.(CPM) | 55 |
| abstract_inverted_index.Based | 91 |
| abstract_inverted_index.being | 73 |
| abstract_inverted_index.data. | 122 |
| abstract_inverted_index.equal | 113 |
| abstract_inverted_index.fuzzy | 17 |
| abstract_inverted_index.given | 79 |
| abstract_inverted_index.kinds | 59 |
| abstract_inverted_index.share | 39 |
| abstract_inverted_index.their | 46 |
| abstract_inverted_index.those | 65, 71 |
| abstract_inverted_index.times | 104, 118 |
| abstract_inverted_index.work, | 3, 98 |
| abstract_inverted_index.always | 109 |
| abstract_inverted_index.differ | 44 |
| abstract_inverted_index.method | 30, 54 |
| abstract_inverted_index.model, | 24 |
| abstract_inverted_index.attempt | 26 |
| abstract_inverted_index.develop | 28 |
| abstract_inverted_index.example | 77 |
| abstract_inverted_index.experts | 36 |
| abstract_inverted_index.network | 13 |
| abstract_inverted_index.observe | 100 |
| abstract_inverted_index.smaller | 110 |
| abstract_inverted_index.solving | 32 |
| abstract_inverted_index.activity | 12 |
| abstract_inverted_index.approach | 5, 86 |
| abstract_inverted_index.concepts | 49 |
| abstract_inverted_index.critical | 9, 52 |
| abstract_inverted_index.findings | 94 |
| abstract_inverted_index.floating | 103, 117 |
| abstract_inverted_index.follows: | 64 |
| abstract_inverted_index.problems | 34 |
| abstract_inverted_index.proposed | 23, 85, 97 |
| abstract_inverted_index.research | 2 |
| abstract_inverted_index.determine | 7 |
| abstract_inverted_index.insights. | 90 |
| abstract_inverted_index.numerical | 76 |
| abstract_inverted_index.opinions. | 47 |
| abstract_inverted_index.proposed. | 20 |
| abstract_inverted_index.considered | 72 |
| abstract_inverted_index.heptagonal | 16 |
| abstract_inverted_index.litigation | 33 |
| abstract_inverted_index.normalized | 15 |
| abstract_inverted_index.optimistic | 69, 106 |
| abstract_inverted_index.information | 42 |
| abstract_inverted_index.pessimistic | 121 |
| abstract_inverted_index.illustration | 82 |
| abstract_inverted_index.optimization | 56 |
| abstract_inverted_index.pessimistic. | 74 |
| abstract_inverted_index.corresponding | 116 |
| cited_by_percentile_year.max | 97 |
| cited_by_percentile_year.min | 94 |
| corresponding_author_ids | https://openalex.org/A5101398697 |
| countries_distinct_count | 3 |
| institutions_distinct_count | 3 |
| corresponding_institution_ids | https://openalex.org/I464993 |
| sustainable_development_goals[0].id | https://metadata.un.org/sdg/16 |
| sustainable_development_goals[0].score | 0.7200000286102295 |
| sustainable_development_goals[0].display_name | Peace, Justice and strong institutions |
| citation_normalized_percentile.value | 0.77607894 |
| citation_normalized_percentile.is_in_top_1_percent | False |
| citation_normalized_percentile.is_in_top_10_percent | False |