On Determining the Critical Path of Activity Network with Normalized Heptagonal Fuzzy Data
January 2021 • Hamiden Abd El-Wahed Khalifa, Majed Alharbi, Pavan Kumar
In this research work, an approach to determine the critical path of activity network with normalized heptagonal fuzzy data is proposed. In the proposed model, we attempt to develop a method for solving litigation problems by experts when they share the same information but differ in their opinions. The concepts for a critical path method (CPM) optimization with two kinds of data are as follows: those are to be optimistic and those considered being pessimistic. A numerical example is given for the illustration of …