The Development of a New High Field Injection Septum Magnet System for Main Ring of J-Parc Article Swipe
YOU?
·
· 2016
· Open Access
·
· DOI: https://doi.org/10.18429/jacow-ipac2016-tupmr039
· OA: W2551581612
We are improving the Main Ring (MR) for beam power of 750 kw which is the first goal of J-PARC. The repetition period of the fast extraction must be short to 1.3 second from the current period of 2.48 second for the improvement of the beam power. It is necessary to exchange a high field injection septum magnet which will be installed at the injection line from RCS to MR and its power supply, because the current injection septum system can not be operated with 1.3 second repetition. Since confirmed the large leakage field around current circling beam line of the injection magnet, we must improve the shielding structure which make low leakage field. We started the development of the new injection septum magnet and its power supply in 2013. It can operate with 1 Hz repetition and the low leakage field which its order is 10⁻⁴ of the gap field. The new Injection septum magnet and the new power supply were constructed in Winter of 2014. We had many improvement of the magnet and power supply. We will install the new injection septum magnet system in this summer. In this presentation, we will report the detail of the results of its performance.