The New High Field Injection Septum Magnet System for Main Ring of J-PARC Article Swipe
YOU?
·
· 2017
· Open Access
·
· DOI: https://doi.org/10.18429/jacow-ipac2017-mopik034
· OA: W2970145654
We are improving the Main Ring (MR) for beam power of 750 kw which is the first goal of J-PARC. The repetition period of the fast extraction must be short to 1.3 second from the current period of 2.48 second for the improvement of the beam power. We exchanged a injection septum magnet which are located at the injection line from RCS to MR and its power supply in summer of 2016. It was necessary to exchange, because the previous injection septum system can not be operated with 1.3 second repetition. The development of the new injection septum magnet and its power supply in which the maximum repetition are 1Hz and the order od the leakage field are 10⁻⁴ of the gap field were completed in 2016. In this presentation, we will report the final results of its performance, e.g. the magnetic fields and stability of the output current and field, and the beam performance after installation in MR with the new injection magnet.