Enhancing Construction Project Workflow Reliability through Observe–Plan–Do–Check–React Cycle: A Bridge Project Case Study
2023-09-19 • Ashtad Javanmardi, Chuanni He, Simon M. Hsiang, S. Alireza Abbasian-Hosseini, Min Liu
This research aims to determine the appropriate level of effort required for each step of the Observe–Plan–Do–Check–React (OPDCA) cycle to improve the workflow reliability of a construction project. Empirical data on detailed weekly meeting minutes over 18 weeks and the planned and actual starting and finish times of 475 activities were collected from a bridge construction case project. The information theory approach was utilized to measure the information gained from discussions pertaining to the OPDCA cycle dur…
Project 211
Project 23000E
Sagar Mala Project
Microsoft Project
Galileo Project
Project Azorian
Construction Of The World Trade Center
Project Harp
No.6 Collaborations Project
Exploring foci of
2020-04-18
How Does Experience with Delay Shape Managers’ Making-Do Decision: Random Forest Approach
2020-04-18 • YuXiang Zhang, Ashtad Javanmardi, Yanchun Liu, Shujuan Yang, XiuXia Yu, Simon M. Hsiang, Zhihao Jiang, Min Liu
Making-do, a decision to start a construction task despite knowing that its preconditions are not fully ready, is a complex dilemma for construction managers. Managers' previous making-do decisions and the resulting consequence, delay, can have a significant impact on future making-do decisions. To understand how managers' experience with delay impacts their making-do decision and how it is handled differently in different countries, two surveys were administered, one in China and one in the United States (US), an…
My Love Story With Yamada-Kun At Lv999
Die Hard With A Vengeance
Wheatfield With Crows
Experience (The Prodigy Album)
A Dance With Dragons
A Room With A View
You Don't Mess With The Zohan
List Of People With Bipolar Disorder
How To Get Away With Murder (Season 3)
Exploring foci of
2019-07-03
Manager Perception and Decision for Making-Do in China v.s. In the U.S.
2019-07-03 • Ashtad Javanmardi, YuXiang Zhang, Yanchun Liu, Shujuan Yang, XiuXia Yu, Min Liu, Simon M. Hsiang
Making-do, a decision to start work despite knowing that preconditions are not fully ready, has been referred as a type of waste in construction projects.It will be interesting and beneficial to understand how project managers make making-do decisions when managing projects in different countries and cultures.This research conducted two surveys, one in China and one in the U.S., to study how making-do decision is made differently in two countries by project managers with various levels of experience and responsibi…
England National Football Team Manager
Football Manager 2020
Download Manager
Tite (Football Manager)
The Night Manager (Indian Tv Series)
Binary Decision Diagram
Tiling Window Manager
José Gomes (Football Manager)
Executive Decision
Exploring foci of
2018-07-16
Constraint Removal and Work Plan Reliability: A Bridge Project Case Study
2018-07-16 • Ashtad Javanmardi, S. Alireza Abbasian-Hosseini, Simon M. Hsiang, Min Liu
Effective removal of constraints is critical in the Last Planner System (LPS ® )to improve work plan reliability.While removing constraints is important, it remains unclear to project managers about which types of constraint have the highest level of uncertainty and to what extent the constraint removal discussions are efficient for improving work plan reliability.This research uses a bridge project as an example to answer these research questions.The authors collected planning meeting minutes, look ahead plans, a…
Business As Usual (Men At Work Album)
2017 United Express Passenger Removal
Sex Work
Aerial Work Platform
100 Best Companies To Work For
Work Function
Statement Of Work
Work Order
Constraint Satisfaction Problem
Exploring foci of
2016-01-01
Analysis of Workflow Variability's Impacts on Trade and Project Performance
2016-01-01 • Ashtad Javanmardi, S. Alireza Abbasian-Hosseini, Min Liu, Simon M. Hsiang
Variability, defined as the deviation of production capacity from an expected average, has a negative impact on the productivity of downstream trades and the entire system. It increases project duration, lost capacities and inventory of the downstream trades. This paper, using Parade Game Simulation, aims to identify the key trade(s) of a single-line production system that contribute(s) the most in reducing/increasing the project duration, total lost capacity and total inventory buffer. The simulation model includ…
Slope Stability Analysis
Exploratory Factor Analysis
Gravimetric Analysis
Requirements Analysis
Technical Analysis
Fundamental Analysis
Mathematical Analysis
Complex Analysis
Geometric Analysis