View article: Model Predictive Current Control for Asymmetric Six-phase Permanent Magnet Motors With Less Computation and Optimized Voltage Vector Magnitude
Model Predictive Current Control for Asymmetric Six-phase Permanent Magnet Motors With Less Computation and Optimized Voltage Vector Magnitude Open
For the sake of the fixed magnitude of candidate control sets, the conventional model predictive current control (MPCC) for asymmetric six-phase permanent magnet motors suffers from huge harmonic currents. This article designs a novel MPCC…
View article: Simulation of the HTR-10 Operation History With the PANGU Code
Simulation of the HTR-10 Operation History With the PANGU Code Open
The 10 MW High Temperature Gas-cooled Reactor-Test Module (HTR-10) is the first High Temperature Gas-cooled Reactor (HTGR) in China, which was operated from January 2003 to May 2007. The HTR-10 operation history provides very important dat…
View article: Steady-state thermal fluids analysis for the HTR-PM equilibrium core
Steady-state thermal fluids analysis for the HTR-PM equilibrium core Open
The high temperature gas-cooled reactor-pebble bed module (HTR-PM), designed by the Institute of Nuclear and New Energy Technology (INET) of Tsinghua University, is a demonstration project of nuclear power plant with modular high temperatu…
View article: Dynamic response of the HTR-10 under the control rod withdrawal test without scram
Dynamic response of the HTR-10 under the control rod withdrawal test without scram Open
As one of the safety demonstration tests performed on the 10 MW High Temperature Gas-cooled Reactor-Test Module (HTR-10), a control rod withdrawal (CRW) test was conducted without reactor scram. In the test process, about 5‰ ∆k/k positive …
View article: Temperature Response of the HTR-10 during the Power Ascension Test
Temperature Response of the HTR-10 during the Power Ascension Test Open
The 10 MW High Temperature Gas-Cooled Reactor-Test Module (HTR-10) is the first High Temperature Gas-Cooled Reactor in China. With the objective of raising the reactor power from 30% to 100% rated power, the power ascension test was planne…