G. Krafczyk
YOU?
Author Swipe
View article: A Dual Triangle Timing Circuit for Improved Performance of 4-Quadrant H-Bridge Switches
A Dual Triangle Timing Circuit for Improved Performance of 4-Quadrant H-Bridge Switches Open
Fermilab is in the process of upgrading its Booster Correction Element System to include full field correction element magnets to correct position and chromaticity throughout the booster cycle. This upgrade requires power supplies with max…
View article: Fermilab's Booster Correction Element Power Supply Silicon Temperature Rise
Fermilab's Booster Correction Element Power Supply Silicon Temperature Rise Open
Fermilab is in the process of upgrading its Booster Correction Element System to include full field correction element magnets to correct position and chromaticity throughout the booster cycle. For good reliability of the switchmode power …
View article: Automating Orbit Correction in the Main Injector 8 GeV Line
Automating Orbit Correction in the Main Injector 8 GeV Line Open
The Main Injector 8 GeV line (MI8 line) transports beam from Fermilab's Booster accelerator to either the Booster Neutrino experiments (BNB), the Recycler or the Main Injector. Often the orbit of the beam through the MI8 line differs depen…
View article: New Fast Kicker Results from the Muon g-2 E-989 Experiment at Fermilab
New Fast Kicker Results from the Muon g-2 E-989 Experiment at Fermilab Open
We describe the installation, commissioning, and characterization of the injection kicker system for the E-989 experiment at Fermilab for a precision measurement of the muon anomalous magnetic moment. Control and monitoring systems have be…
View article: Design Status of the LBNF/DUNE Beamline
Design Status of the LBNF/DUNE Beamline Open
The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a wide band beam of neutrinos of sufficient intensity and appropriate energy toward DUNE detectors, placed 4850 feet underground at S…
View article: Design of the LBNF Beamline Target Station
Design of the LBNF Beamline Target Station Open
The Long Baseline Neutrino Facility (LBNF) project will build a beamline located at Fermilab to create and aim an intense neutrino beam of appropriate energy range toward the DUNE detectors at the SURF facility in Lead, South Dakota. Neutr…
View article: Design of the LBNF Beamline
Design of the LBNF Beamline Open
The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a neutrino beam of sufficient intensity and appropriate energy range toward DUNE detectors, placed deep underground at the SURF Facil…