Gerrit Jan Focker
YOU?
Author Swipe
View article: Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam
Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam Open
In the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) will be extensively modified during the Long Shutdown 2 (LS2, 2019-2020) at CERN [1]. This includes a new injector, Linac4, which will provide…
View article: The ISOLDE facility
The ISOLDE facility Open
The ISOLDE facility has undergone numerous changes over the last 17 years driven by both the physics and technical community with a common goal to improve on beam variety, beam quality and safety. Improvements have been made in civil engin…
View article: Beam Instrumentation for the CERN LINAC4 and PSB Half Sector Test
Beam Instrumentation for the CERN LINAC4 and PSB Half Sector Test Open
The construction, installation and initial commissioning of CERN's LINAC4 was completed in 2016 with H⁻ ions successfully accelerated to its top energy of 160 MeV. The accelerator is equipped with a large number of beam diagnostic systems …