Juan Allica Santamaria
YOU?
Author Swipe
View article: Evolution of the CERN LINAC 4 Intensity Interlock System Using a Generic, Real-Time Comparator in C++
Evolution of the CERN LINAC 4 Intensity Interlock System Using a Generic, Real-Time Comparator in C++ Open
During the commissioning phase of LINAC 4, three watchdog interlock systems were used to protect the accelerator and its equipment. These systems cut the beam if losses, calculated by combining the intensity measurements at various locatio…
View article: Beam Instrumentation for the CERN LINAC4 and PSB Half Sector Test
Beam Instrumentation for the CERN LINAC4 and PSB Half Sector Test Open
The construction, installation and initial commissioning of CERN's LINAC4 was completed in 2016 with H⁻ ions successfully accelerated to its top energy of 160 MeV. The accelerator is equipped with a large number of beam diagnostic systems …
View article: Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4
Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4 Open
During the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron Booster (PSB) will undergo a profound upgrade in the framework of the LHC Injector Upgrade (LIU) project involving also the connection to the new Linac4 injector. …