Yoshihara, Keisuke
YOU?
Author Swipe
View article: Study on a novel laser fast abort system for SuperKEKB
Study on a novel laser fast abort system for SuperKEKB Open
To ensure stable and continuous commissioning of SuperKEKB, the machine protection system (MPS) plays a crucial role in safeguarding the accelerator's hardware from damage caused by beam loss. The response time of the MPS is a critical fac…
View article: Upgrade of beam abort system at the SuperKEKB positron ring
Upgrade of beam abort system at the SuperKEKB positron ring Open
We upgraded the beam abort system at the SuperKEKB positron ring to speed up the abort response and mitigate the damage caused by Sudden Beam Loss (SBL). An SBL event can result in the loss of tens of percent of the beam current within one…