P. Chatzidaki
YOU?
Author Swipe
View article: What makes digital learning effective? Evaluation of a digital learning module about positron emission tomography
What makes digital learning effective? Evaluation of a digital learning module about positron emission tomography Open
Following the global COVID-19 pandemic, digital learning environments have gained in importance in education all around the world. A new digital learning format called a “Digital Learning Module” (DLM) was developed within the Physics Educ…
View article: Introducing modern particle detectors in the classroom: a slice-by-slice overview
Introducing modern particle detectors in the classroom: a slice-by-slice overview Open
This paper aims to provide a basis for teachers interested in bringing modern particle detectors into their classrooms. In particular, it gives an overview of the basic principles of modern particle detectors, linking them to concepts that…
View article: Correction of the baseline fluctuations in the GEM-based ALICE TPC
Correction of the baseline fluctuations in the GEM-based ALICE TPC Open
To operate the ALICE Time Projection Chamber in continuous mode during the Run 3 and Run 4 data-taking periods of the Large Hadron Collider, the multi-wire proportional chamber-based readout was replaced with gas-electron multipliers. As e…
View article: The New CERN Low-energy Facilities for Neutrino Detector Tests
The New CERN Low-energy Facilities for Neutrino Detector Tests Open
The beamlines at CERN’s North and East Areas offer secondary beams in a wide range of momenta between 0.5 GeV/ c and 400 GeV/ c for fixed-target experiments as well as for test beam campaigns with a flexible configuration and variable beam…
View article: Commissioning Results of the Tertiary Beam Lines for the CERN Neutrino Platform Project
Commissioning Results of the Tertiary Beam Lines for the CERN Neutrino Platform Project Open
For many decades the CERN North Area facility at the Super Proton Synchrotron (SPS) has delivered secondary beams to various fixed target experiments and test beams. In 2018, two new tertiary extensions of the existing beam lines, designat…
View article: Commissioning Results of the Tertiary Beam Lines for the CERN Neutrino Platform Project
Commissioning Results of the Tertiary Beam Lines for the CERN Neutrino Platform Project Open
For many decades the CERN North Area facility at the Super Proton Synchrotron (SPS) has delivered secondary beams to various fixed target experiments and test beams. In 2018, two new tertiary extensions of the existing beam lines, designat…