On Determining the Critical Path of Activity Network with Normalized Heptagonal Fuzzy Data Article Swipe
YOU?
·
· 2021
· Open Access
·
· DOI: https://doi.org/10.1155/2021/6699403
In this research work, an approach to determine the critical path of activity network with normalized heptagonal fuzzy data is proposed. In the proposed model, we attempt to develop a method for solving litigation problems by experts when they share the same information but differ in their opinions. The concepts for a critical path method (CPM) optimization with two kinds of data are as follows: those are to be optimistic and those considered being pessimistic. A numerical example is given for the illustration of the proposed approach and gain more insights. Based on the findings of the proposed work, we observe that the floating times with optimistic data are always smaller than or equal to the corresponding floating times for the pessimistic data.
Related Topics To Compare & Contrast
- Type
- article
- Language
- en
- Landing Page
- https://doi.org/10.1155/2021/6699403
- https://downloads.hindawi.com/journals/wcmc/2021/6699403.pdf
- OA Status
- hybrid
- Cited By
- 8
- References
- 29
- Related Works
- 10
- OpenAlex ID
- https://openalex.org/W3177617506